Jacking municipal frame bridge structure and construction method

A construction method and technology of frame-structured bridges, which are applied in infrastructure engineering, excavation, bridges, etc., can solve problems such as excessive uplift, improper construction control, and impact on driving safety, and achieve the effect of reducing impact

Active Publication Date: 2020-08-07
CHINA RAILWAY ENG CONSULTING GRP CO LTD
View PDF5 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

In recent years, the requirements for the deformation control of high-speed rail bridges have become increasingly strict, and railway safety must be ensured during the operation period. At present, the existing technologies for municipal engineering adjacent to high-speed rail bridge piles are mainly open excavation, concealed excavation, and shield construction. The cost of underground excavation and shield construction It is generally high and has strict requirements on the alignment of municipal roads. The open-cut construction method can easily cause high-speed rail bridge piles to bulge when unloading soil during foundation pit excavation. Improper construction control can easily cause the amount of uplift to exceed the limit and the smoothness of the high-speed rail track to exceed the limit , affecting driving safety

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Jacking municipal frame bridge structure and construction method
  • Jacking municipal frame bridge structure and construction method
  • Jacking municipal frame bridge structure and construction method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0033] In order to make the objectives, technical solutions, and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be described clearly and completely in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments It is a part of the embodiments of the present invention, not all the embodiments. The components of the embodiments of the present invention generally described and illustrated in the drawings herein may be arranged and designed in various different configurations. Therefore, the following detailed description of the embodiments of the present invention provided in the accompanying drawings is not intended to limit the scope of the claimed invention, but merely represents selected embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinar...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to the technical field of municipal frame bridge construction, in particular to a jacking municipal frame bridge structure and a construction method. The jacking municipal framebridge structure comprises a foundation pit, the two sides of the foundation pit are each provided with a first fender post crown beam and a plurality of first fender posts, a back post is arranged atthe tail of the foundation pit, and a back post crown beam is arranged at the top of the back post; a cast-in-place frame structure bridge is arranged in the foundation pit, and a sliding piece is arranged at the bottom of the frame structure bridge. Second fender post top beams and a plurality of second fender posts are arranged on the two sides, in place, of the frame structure bridge. According to the invention, the pushing construction method is applied to the design and construction of the municipal frame-structure bridge close to the high-speed rail bridge; the problem of high-speed rail bridge pile upheaval caused by soil body unloading in construction is solved through structural balance weight, the influence of long soil body exposure time on high-speed rail bridge pile deformation is reduced through time and space timeliness, and the influence of municipal road high-speed rail bridge pile construction close to high-speed rail bridge piles on existing railway operation is effectively reduced.

Description

Technical field [0001] The invention relates to the technical field of construction of municipal frame bridges, in particular to a jacking municipal frame bridge structure and a construction method. Background technique [0002] Municipal road engineering is an important part of urban construction. The municipal frame bridge is a highway-rail overpass that passes under the highway and is close to the railway. Its main structure is a box-shaped frame. The framed bridge does not affect the normal operation of the railway during its implementation. At present, due to the rapid development of high-speed railway construction, there are more and more municipal roads underpassing high-speed railway bridge projects. During the underpassing process, there will be problems with adjacent high-speed railway bridge piles. In recent years, high-speed rail bridge deformation control requirements have become increasingly strict, and railway safety during operation must be ensured. At present, th...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): E01C1/04E02D17/04E01D21/00
CPCE01C1/04E01D21/00E02D17/04
Inventor 王婷王德福高玉兰刘建友于晨昀马锴董沂鑫彭斌王杨姜艳红
Owner CHINA RAILWAY ENG CONSULTING GRP CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products