Environment-protecting bridge pile foundation construction method for water conservancy construction
A construction method and bridge technology, applied in the direction of sheet pile walls, foundation structure engineering, load hanging components, etc., can solve the problems of environmental pollution, energy waste, etc., and achieve the effect of reducing workload and accelerating completion time
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0040] According to an embodiment of the present invention, an environmentally friendly construction method of bridge pile foundation in water conservancy construction is provided.
[0041] Such as Figure 1-2 As shown, an environmentally friendly bridge pile foundation construction device for water conservancy construction includes steel pipe piles 1 distributed in a matrix, and flat joint pipes 2 are welded on the outer wall between adjacent steel pipe piles 1 to strengthen the steel pipe piles 1 The overall firmness between the steel pipe piles 1 is distributed in a 3*3 matrix, and the cross section of the flat tube 2 and the steel pipe pile 1 constitutes a "Tian"-shaped member, and the Tian-shaped structure has a strong horizontal supporting force. , The multi-row flat union pipes 2 produce the same supporting force on the steel pipe pile 1 from top to bottom, so that the lateral pressure of the steel pipe pile 1 is the same to prevent its deformation. The steel pipe pile 1 an...
Embodiment 2
[0053] Such as Figure 7-8 As shown, in the first embodiment, after the concrete irrigation pipe 7 is buried in the created foundation pit, a bridge is laid on the concrete irrigation pipe 7 and the elevation of the top of the concrete irrigation pipe 7 is measured. The deviation of each concrete irrigation pipe 7 is timely After adjustment, the cap is fixed on the center of the pile foundation and the column, and the middle pier and the head pier are poured; multiple middle piers and the head piers on both sides are connected by beams to form a bridge support higher than the ground line, and the seismic block is fixed Above the pier at the head of the beam, the support is fixed above the middle pier of the beam, the wedge-shaped groove on the bridge surface is inserted into the support, and the bolt is used to connect and fix it with the erected bridge surface; the arch feet are assembled in sections on the bridge The surface connects the arch ribs to form an arch, and the arc...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com