Preparation method of fabricated wall body
A prefabricated, wall technology, applied in the direction of walls, building components, buildings, etc., can solve the problems of low production efficiency, construction pollution, low efficiency, etc., and achieve the effect of improving production efficiency, construction quality assurance, high efficiency and rapid production
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
preparation example Construction
[0047] see Figure 4 to Figure 8 The preparation method shown in this embodiment one can prepare the above-mentioned prefabricated wall, which specifically includes the following steps:
[0048] (1) Keel loading; (2) Thermal insulation material loading; (3) Wall panel loading; (4) Nailing and fixing; (5) On-site merging.
[0049] Among them, steps (1) to (4) are completed in the factory, and the unit wall panel production equipment in the factory is automatically processed to produce the unit wall panel 100, and step (5) is completed at the installation site of the prefabricated wall Finish.
[0050] Such as Figure 8As shown, the unit wallboard production equipment specifically includes a factory assembly platform 200 providing an assembly space, and a feeding device for keel 101, gypsum board and glass wool, and also includes a unit wallboard 100 unloading unit for forming. Material unloading equipment. Among them, such as Figure 8 As shown, the feeding equipment and t...
Embodiment 2
[0063] see Figure 9 with Figure 10 Shown is the preparation method of the prefabricated wall of the second embodiment.
[0064] Specifically, such as Figure 9 with Figure 10 As shown, in order to prevent the splicing of the next keel frame 105 after the keel 101 in the feed bin 401 is grabbed, the side of the first robot 501 is also provided with an auxiliary feed bin 405, and the auxiliary feed bin 405 is located in the first robot 501 within the reachable range, it can replenish the keel 101 in the feed bin 401 . After the step (1), the first robot 501 can grab a preset number of keels 101 from the silo 401 into the auxiliary silo 405 , and then the silo 401 returns to the manual loading end 403 to fill the keels 101 .
Embodiment 3
[0066] see Figure 11 to Figure 14 Shown is the preparation method of the prefabricated wall in the third embodiment.
[0067] Specifically, such as Figure 11 with Figure 12 As shown, because the height of the keels 101 on the left and right sides of the unit wall panel 100 is different, a gap 107 is provided on one side of the unit wall panel 100. When the unit wall panel 100 is placed on a horizontal plane, it will be inclined and cannot pile.
[0068] In order to avoid the above-mentioned problems, during the stacking process of the unit wall panels 100, a spacer 108 is added between two adjacent unit wall panels 100, and the spacer 108 is located in the gap 107, so that the unit wall panels 100 are horizontally set, and can be unloaded. The stacking on the material turntable 800 is also convenient for the transfer of forklifts.
[0069] The unit wallboard production equipment also includes a pad feeding mechanism 900, which is arranged on one side of the second robot...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com