Preparation method of fabricated wall body

A prefabricated, wall technology, applied in the direction of walls, building components, buildings, etc., can solve the problems of low production efficiency, construction pollution, low efficiency, etc., and achieve the effect of improving production efficiency, construction quality assurance, high efficiency and rapid production

Active Publication Date: 2020-09-04
BEIJING NEW BUILDING MATERIALS PLC
View PDF5 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] The invention provides a method for preparing a prefabricated wall, which can overcome the problem of low production efficiency, solve the problems of low efficiency and construction pollution in traditional wall construction, and can efficiently and quickly produce prefabricated walls. At the same time, the construction quality also guaranteed

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Preparation method of fabricated wall body
  • Preparation method of fabricated wall body
  • Preparation method of fabricated wall body

Examples

Experimental program
Comparison scheme
Effect test

preparation example Construction

[0047] see Figure 4 to Figure 8 The preparation method shown in this embodiment one can prepare the above-mentioned prefabricated wall, which specifically includes the following steps:

[0048] (1) Keel loading; (2) Thermal insulation material loading; (3) Wall panel loading; (4) Nailing and fixing; (5) On-site merging.

[0049] Among them, steps (1) to (4) are completed in the factory, and the unit wall panel production equipment in the factory is automatically processed to produce the unit wall panel 100, and step (5) is completed at the installation site of the prefabricated wall Finish.

[0050] Such as Figure 8As shown, the unit wallboard production equipment specifically includes a factory assembly platform 200 providing an assembly space, and a feeding device for keel 101, gypsum board and glass wool, and also includes a unit wallboard 100 unloading unit for forming. Material unloading equipment. Among them, such as Figure 8 As shown, the feeding equipment and t...

Embodiment 2

[0063] see Figure 9 with Figure 10 Shown is the preparation method of the prefabricated wall of the second embodiment.

[0064] Specifically, such as Figure 9 with Figure 10 As shown, in order to prevent the splicing of the next keel frame 105 after the keel 101 in the feed bin 401 is grabbed, the side of the first robot 501 is also provided with an auxiliary feed bin 405, and the auxiliary feed bin 405 is located in the first robot 501 within the reachable range, it can replenish the keel 101 in the feed bin 401 . After the step (1), the first robot 501 can grab a preset number of keels 101 from the silo 401 into the auxiliary silo 405 , and then the silo 401 returns to the manual loading end 403 to fill the keels 101 .

Embodiment 3

[0066] see Figure 11 to Figure 14 Shown is the preparation method of the prefabricated wall in the third embodiment.

[0067] Specifically, such as Figure 11 with Figure 12 As shown, because the height of the keels 101 on the left and right sides of the unit wall panel 100 is different, a gap 107 is provided on one side of the unit wall panel 100. When the unit wall panel 100 is placed on a horizontal plane, it will be inclined and cannot pile.

[0068] In order to avoid the above-mentioned problems, during the stacking process of the unit wall panels 100, a spacer 108 is added between two adjacent unit wall panels 100, and the spacer 108 is located in the gap 107, so that the unit wall panels 100 are horizontally set, and can be unloaded. The stacking on the material turntable 800 is also convenient for the transfer of forklifts.

[0069] The unit wallboard production equipment also includes a pad feeding mechanism 900, which is arranged on one side of the second robot...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a preparation method of a fabricated wall body, and relates to the field of fabricated wall body production. The preparation method includes the following steps of (1), keel feeding; (2), heat insulating material feeding; (3), wall panel feeding; (4), nailing fixing; and (5), site combining. The fabricated wall body is obtained. According to the preparation method of the fabricated wall body, the problem that the production efficiency is low can be solved, the problems of low efficiency, construction pollution and the like during traditional wall body construction are solved, the fabricated wall body can be efficiently and rapidly produced, and meanwhile the construction quality can be guaranteed.

Description

technical field [0001] The invention relates to the field of assembly wall production, in particular to a method for preparing an assembly wall. Background technique [0002] The traditional gypsum board keel wall structure is a relatively old building structure wall. The specific construction method is to use the horizontal keel as the sky and earth keel, use expansion bolts to fix the roof and the ground respectively, and use the vertical keel to connect the sky and the earth. The junction of the horizontal keel and the vertical keel is connected with self-tapping nails, plaster boards are pasted on both sides of the keel, and rock wool boards are installed between the gypsum boards. Therefore, the traditional gypsum board keel wall is basically pure manual work, which is inefficient and produces a large amount of construction waste, resulting in a poor construction environment and destroying the surrounding environment. At the same time, the construction quality cannot be...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E04B2/74E04B2/58
CPCE04B2/74E04B2/58
Inventor 武发德
Owner BEIJING NEW BUILDING MATERIALS PLC
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products