Steel pipe concrete column and steel bar concrete column splicing joint and construction method
A technology for reinforced concrete columns and concrete-filled steel tube columns, which is applied in the direction of columns, pier columns, pillars, etc., can solve problems such as the difficulty in splicing steel-filled concrete columns and reinforced concrete columns, the lack of reliable splicing methods, and restrictions on the application of high-rise buildings. The effect of simplicity, firm splicing nodes, and good force transmission performance
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0034] This embodiment provides a splicing joint between a steel pipe concrete column and a reinforced concrete column, such as Figure 6 As shown, the splicing node includes a lower concrete-filled steel tube column 2 , an upper reinforced concrete column 3 and a splicing component 1 in the middle.
[0035] The splicing part 1 comprises a closed-loop channel steel. Such as Figure 1~3 As shown, the shape of the closed-loop channel steel is square and hollow, and the overall shape is back-shaped. It is formed by welding four pieces of channel steel 11 cut into trapezoidal shapes.
[0036] The upper and lower ends of the splicing part 1 are the surfaces of the flange plates 112 of the closed-loop channel steel, and the upper and lower flange plates 112 are provided with multiple sets of relative through holes 12, and the side surfaces of the splicing part 1 are the outer sides of the web 111 of the closed-loop channel steel.
[0037] Such as Figure 5 As shown, the steel pip...