Shield receiving semi-open steel sleeve mechanism and construction method thereof
A semi-open, steel-sleeved technology, which is applied in earth square drilling, mining equipment, mining equipment, etc., can solve problems such as reducing construction safety risks and unreasonable force, and achieves simplified construction procedures, reduced construction period, and reduced seepage. The effect of leakage pressure
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0044] Below the present invention is further described:
[0045] see Figure 1-4 , which is an arc-shaped water-stop rubber strip with a certain thickness and width
[0046] The invention discloses a shield receiving semi-open steel sleeve mechanism, which includes a steel sleeve body used to fit a shield machine 31, a short steel sleeve 7, an arc-shaped side soil retaining strip 12, and a reinforcing cover plate 13 , reaction force frame 15, large grouting nozzle 17, small grouting nozzle 30, and grouting nozzle 18, the steel sleeve body is composed of front unit steel sleeve 101 and rear unit connected in sequence along its axial direction. The steel sleeve 102 is composed of; the front unit steel sleeve 101 and the rear unit steel sleeve 102 are respectively composed of a front semicircular steel cylinder 1, a front semicircular steel cylinder 3 with a base, and a rear semicircular steel cylinder along its circumference. 2. It is composed of a rear semicircular steel cyl...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


