Forepoling small guide pipe and advanced grouting supporting method for deep soft rock roadway
A technology of advanced support and small conduit, applied in the direction of tunnel, tunnel lining, earthwork drilling, etc., can solve problems such as brittle failure, and achieve the effect of increasing friction, reducing shear force and improving tensile strength.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0040] refer to Figure 1-2 , the present embodiment provides a small catheter for advance support, which includes a hollow catheter body, a grouting port for grouting at the end, a jacking portion at the head end, and openings along the length direction of the catheter body. A slurry hole 4 communicating with its internal hollow part; at least one section of the conduit body is a curved pipe body 1; a plugging tray 8 is arranged coaxially at the end of the conduit body, and the plugging tray extends in a tray shape along its radial direction; jacking The head and the conduit body are inserted into the roadway wall in sequence, and the grout is injected into the conduit body through the grouting port 3 and overflows from the overflow hole 4 into the roadway wall. Seep out of the roadway wall, and the slurry solidifies in the roadway wall to form the support before the roadway excavation.
[0041] The ultra-strong support small conduit provided by the present invention has at ...
Embodiment 2
[0052] refer to Figure 3-4 , this embodiment provides a method of advanced grouting support for deep soft rock roadways, using the small conduit for advanced support as described in Example 1, for advanced grouting support before excavation of deep soft rock roadways , the method includes the following support construction steps:
[0053] S1: Determine the construction points that are prone to collapse on the deep soft rock roadway to be excavated, and mark multiple control points on the radial section of the roadway where the construction point is located;
[0054] S2: Drill a hole at the control point, and drive the small conduit of the advance support into the roadway wall through the hole;
[0055] S3: preparing grout, injecting the grout into the small conduit of the advance support through the grouting port 3, and injecting the grout into the roadway wall through the grout overflow hole 4;
[0056] S4: After the grouting is completed, screw the locking part, lock the ...