Cable rope crane system and hoisting method

A cable crane and cable tower technology, which is applied in the direction of cable cranes, cranes, load hanging components, etc., can solve the problems of arch bridge headroom, construction, and the inability to use full hall supports, etc.
CN111807232AInactive Publication Date: 2020-10-23CHONGQING COMM CONSTR GRP +1

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
CHONGQING COMM CONSTR GRP
Publication Date
2020-10-23
Estimated Expiration
Not applicable · inactive patent

Smart Images

  • Figure 1
    Figure 1
  • Figure 2
    Figure 2
  • Figure 3
    Figure 3
Patent Text Reader

Abstract

The invention relates to the technical field of bridge construction, in particular to a cable rope crane system and a hoisting method. The cable rope crane system crosses over the two sides of a riverand is composed of cable bent towers, cable ropes, an anchoring system, cable saddles, a hoisting car and a buckling and hanging system. The cable bent towers are mounted on the two opposite sides ofthe river through foundation embedded parts and are connected with the foundation embedded parts through bolts. The cable saddles are arranged on the cable bent towers. The anchoring system is composed of a rear anchor foundation of a reinforced concrete structure and anchor piles. According to the cable rope crane system and the hoisting method, the technical problem that due to the fact that the clearance of an arch bridge is high, full framing construction cannot be adopted is solved.
Need to check novelty before this filing date? Find Prior Art

Description

technical field

[0001] The invention relates to the technical field of bridge construction, in particular to a cable crane system and a lifting method and method. Background technique

[0002] The construction of the full hall support method is a method that has been adopted for a long time, and a large number of formwork supports are required during construction. The bracket method construction is to set up brackets at the bridge position, pour concrete for the bridge body on the brackets, and remove the formwork and brackets after the concrete reaches strength. The biggest advantage of the support method is that it does not require large hoisting equipment, but its disadvantages are the large consumption of support formwork and the long construction period, which has great limitations for bridges and high piers in mountainous areas.

[0003] In the construction of bridge erection, when the main hole of the arch bridge is a reinforced concrete rib arch, the construction of...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine