Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Information system engineering supervision project quality management system

A system engineering and quality management technology, applied in the field of information system engineering supervision project quality management system, can solve problems such as inability to realize business operation requirements, deviations in project control and subsequent cost accounting, and inability to share and integrate functions and data

Active Publication Date: 2020-10-23
北京中百信信息技术股份有限公司
View PDF4 Cites 11 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] (1) At present, with the increasingly complex and large-scale engineering project management, the exchange and transmission of project information is becoming more and more frequent. However, the coupling between the functional modules of the existing enterprise management subsystem and the functional modules of the production management subsystem The degree is high, and the overall function realization effect is relatively fixed
As a result, the existing supervision system cannot meet the actual needs of rapid customization and rapid release
Often just want to adjust a small function but have to wait for a complete renovation at the overall system level, which consumes a huge amount of man-hours, neither quick adjustment nor quick use can be achieved
[0004] (2) The existing supervision system can be managed in accordance with the supervision management industry standards and industry regulations, but the supervision standards of the system only stipulate what behaviors are involved, but there is no regulation and the time and duration of management behaviors, so that it is impossible to control supervision Control the cost of personnel input in the project
It is even more difficult to grasp the working conditions of project members, keep abreast of the progress of the project, and cannot accurately grasp the project
[0005] (3) The functions and data of the enterprise management part and the production (project) management part in the supervision system cannot be shared and integrated, and the senior management of the enterprise cannot timely understand the accurate project statistics such as the project cost of the entire department and the entire company, and often need to select projects separately Manual accounting of the data is necessary to understand the overall profit data of the company, which is neither timely nor accurate, and requires manpower for unified accounting, wasting resources
[0006] (4) The project management part of the existing supervision system means that the person in charge of the project assigns personnel to the work tasks, and other roles cannot make further personnel adjustments according to the changes in project tasks and actual implementation, so that the actual task allocation and The actual participants are often not matched, unable to reflect the real implementation situation, causing large deviations in project control and subsequent cost accounting
[0007] (5) The role and authority configuration of the existing supervision system is relatively fixed and single, and it is impossible to adjust the user authority of the system according to changes in the actual enterprise system and work process, so that the business operation requirements cannot be realized, and only new research and development can be carried out

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Information system engineering supervision project quality management system
  • Information system engineering supervision project quality management system
  • Information system engineering supervision project quality management system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0070] Specifically, as figure 1 As shown in the schematic diagram of the overall functional module composition of the present invention, the core method used by the present invention to realize personalized customization is to analyze and summarize 36 events covering supervision service planning and design, deployment implementation, and operation and maintenance according to supervision industry standards as supervision projects The executed basic service units (36 supervision standard events listed in Table 1) form event templates, which are distributed in the corresponding milestone stages of the supervision project, and the basic service units are further disassembled into hundreds of task events for Personnel distribution and collection of man-hours are analyzed by system algorithms to realize hierarchical management of the implementation process of supervision projects, accurate tracking of project progress, and lean analysis of costs at all levels.

[0071]

[0072]...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses an information system engineering supervision project quality management system, which comprises a role authorization management module, a workflow module and an authenticationauthorization service, wherein the role authorization management module is used for maintaining a user role; the workflow module comprises a service flow judgment module, a flow definition module, aflow design module, a participation user setting module, a flow condition setting module and an approval template design module; the authentication and authorization service is used for acquiring userrole information when the user logs in and storing the user role information as an access token in system operation; mutual matching of the function modules and different role authorities is realized; performing user verification through the authentication and authorization service to obtain corresponding system permission; the roles are matched into the approval service flow through the workflow, so that each key index link has different levels of responsible persons to perform quality control in the project execution process, the quality cost can be calculated according to three dimensionsof service departments, projects and executors, and the enterprise quality cost is continuously improved.

Description

technical field [0001] The invention belongs to the field of computer application technology, and more specifically relates to a quality management system for information system engineering supervision projects. Background technique [0002] With the continuous advancement of informatization, big data, and Internet technology, some software systems for supervision project management have emerged in the information system engineering supervision industry to realize data information management in the project supervision process, and to a certain extent It has played a positive role in improving the standardization, digitization and management efficiency of the management process. Specifically, the functions of the existing traditional supervision project management system are mainly divided into two parts: the enterprise management subsystem and the production management subsystem. Among them, the enterprise management subsystem mainly includes OA file coordination function, ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): G06Q10/06G06Q10/10
CPCG06Q10/06395G06Q10/103
Inventor 刘庆波张玉杰周威马达卢学哲崔秀文张洪冯本锐况文婷王莉邹晓光王安纲史纪良翁圻刘纯利唐勇陈志勇张玲志
Owner 北京中百信信息技术股份有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products