Novel prestressed steel anchor bearing plate and processing method thereof
A processing method and prestressing technology, applied to bridge parts, bridges, buildings, etc., can solve problems such as grout leakage, difficulties, and steel strand bending
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0033] Example 1, such as Figure 1-4 As shown, a new type of prestressed steel anchor backing plate includes a base plate 1, an extension tube 2 and a grouting nozzle 4. The center of the base plate 1 is stamped with a central hole 13 equivalent to the diameter of the extension tube 2, and the outer edge of the base plate 1 is also equipped with a mounting hole. The hole 11 and the extension tube 2 are welded on the upper end surface of the bottom plate 1, and ensure that the center hole 13 coincides with the inner hole of the extension tube 2, and the side wall of the lower end of the extension tube 2 is provided with a grouting hole 23 which is equivalent to the size of the inner hole of the grouting nozzle 4, and the grouting nozzle 4. The upper port is aligned with the grouting hole 23 and welded to each other. An arc-shaped notch 12 is opened on the outer edge of the bottom plate 1, and the lower end of the grouting nozzle 4 is inserted into the arc-shaped notch 12 and we...
Embodiment 2
[0039] Embodiment 2, a kind of processing method of novel prestressed steel anchor plate, comprises the following steps:
[0040] (1) Steel pipe processing: choose a suitable seamless steel pipe, cut out the steel pipe blanks required for the extension tube 2 and the grouting nozzle 4 according to the required size, and when cutting the steel pipe blanks required for the grouting nozzle 4, follow one end along the 45 The way of angle cutting is cut to form two sections of horizontal steel pipe 41 and vertical steel pipe 42, and the lower end side wall of the extension tube 2 blank is cut out the grouting hole 23;
[0041] (2) Bottom plate processing: select a suitable steel plate, use a lathe to turn out the blanks required for the bottom plate 1, and then punch the blanks of the bottom plate 1 at one time to form mounting holes 11, arc-shaped gaps 12 and center holes 13;
[0042] (3) Forming of the reinforced protrusion: place the blank of the extension tube 2 with the grouti...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


