An application method and concrete technology, which are applied in the field of two-lined vault close-fitting monitoring instruments, can solve problems such as the inability of the worker to accurately determine the completion of the topping, the void and collapse of the second-lined vault, and achieve the effect of reducing voiding phenomenon.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0023] refer to Figure 1-2 , a two-lined vault close-adhesion monitor and its application method in two-lined concrete, comprising the following steps:
[0024] S1. Install the sound and light alarm device on the end template of the second lining trolley;
[0025] S2. Drive the second lining trolley to travel and locate to the designated position, and install the plug template;
[0026] S3. The plug template is installed to the end arch and the patch pressure sensor is installed. The outside of the patch pressure sensor is closely attached to the waterproof plate of the initial support surface;
[0027] S4. Connect the installed patch pressure sensor through the copper foil tape inside the patch sensor, connect it to the sound and light alarm device, and then turn on the power supply. At this time, the sound and light alarm device is displayed in red;
[0028] S5. When the lining concrete is poured to the location of the patch pressure sensor on the vault, because the concr...
Embodiment 2
[0033] Embodiment 2: the difference based on Embodiment 1 is;
[0034] Pressure sensors are arranged on each section of the tunnel vault, and the pressure sensors are connected with sound and light alarms. Four sets of pressure sensors are evenly arranged between the crown openings longitudinally along the centerline of the tunnel, and the two-lined concrete for each slab is monitored in blocks and areas. When the lining concrete is poured to the position of the pressure sensor of the vault, because the concrete is poured from bottom to top, the outside of the pressure sensor is closely attached to the waterproof board of the primary support surface, and the pressure is generated by the second lining concrete on the inside, and the copper foil tape in the sensor is connected and connected. The wires are connected for conductive transmission, and the closed display of relay induction turns from red light to green light. When all pressure sensors have concrete pressure at the co...
PUM