A green demolition and reconstruction construction method of an existing bridge and its sewage collection device
A construction method and sewage collection technology, applied in the direction of water supply installations, bridges, bridge construction, etc., can solve problems such as environmental damage around construction, river pollution, etc., and achieve the effects of reducing pollution and damage, facilitating treatment, and good environmental protection effects
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0052] The following is attached Figure 1-8 The application is described in further detail.
[0053] refer to figure 1 , a bridge 7, including a span beam 71, a cover beam 72, a side beam cantilevered plate 73 and a pier column 74, and there are twelve pier columns 74, which are fixed in the river channel, and there are three ones along the extending direction of the river channel set in rows, three groups of four in the vertical river direction, four cover beams 72 are arranged, and the cover beams 72 are fixed on three adjacent piers 74 along the extending direction of the river channel, and the cover beams 72 are provided with three and erected and fixed on the upper surfaces of two adjacent cover beams 72, the side beam cantilever plates 73 are fixedly arranged on the upper surfaces of the cover beams 72 and are located on both sides of the cover beams 72 perpendicular to the length direction.
[0054] The embodiment of the present application discloses a green demoliti...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


