Continuous beam first section construction method based on karst cave underground river environment tunnel construction
A technology for tunnel construction and construction methods, applied in tunnels, tunnel linings, bridges, etc., can solve problems such as settlement, falling blocks at the top of karst caves, etc., to prevent settlement, improve stability and reliability, and improve backfill and stability. The effect of reliability
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0031] The present invention will be further described in detail below in conjunction with the accompanying drawings and specific embodiments.
[0032] Such as Figure 1 to Figure 3 As shown, the present invention is based on a kind of embodiment of the continuous beam construction method of the first segment of the tunnel construction in the environment of the karst cave underground river. The environment includes a karst cave 1 and an underground river 2 at the bottom of the karst cave 1. The tunnel is section A of the tunnel, and the tunnel passing through the karst cave 1 is section B of the tunnel; the construction method includes the following steps:
[0033] S1: Excavate section A of the tunnel to penetrate the karst cave 1;
[0034] S2: Divert the underground river 2 so that the underground river 2 does not flow through the cave 1;
[0035] S3: backfill the karst cave 1 until it is backfilled to the foundation surface of the tunnel;
[0036] S4: Carry out protective...