Unlock instant, AI-driven research and patent intelligence for your innovation.

Monitoring system and method of overall vertical rotation construction of main tower

A construction monitoring and main tower technology, applied in the direction of electromagnetic measuring devices, using electromagnetic means, instruments, etc., can solve the problems of easy collision risk, inability to guide construction instructions during vertical rotation, and achieve the effect of avoiding collisions

Pending Publication Date: 2020-12-18
CHINA RAILWAY MAJOR BRIDGE ENG GRP CO LTD +1
View PDF0 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] In view of the defects existing in the prior art, the purpose of the present invention is to provide a monitoring system and method for the overall vertical rotation of the main tower, which can solve the problem that in the prior art, it is impossible to provide construction instruction guidance for the entire vertical rotation process, which is prone to collisions. risk issue

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Monitoring system and method of overall vertical rotation construction of main tower
  • Monitoring system and method of overall vertical rotation construction of main tower
  • Monitoring system and method of overall vertical rotation construction of main tower

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0048] In order to make the purposes, technical solutions and advantages of the embodiments of the present application clearer, the technical solutions in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments It is a part of the embodiments of this application, but not all of them. All other embodiments obtained by persons of ordinary skill in the art based on the embodiments in the present application without creative efforts shall fall within the protection scope of the present application.

[0049] Embodiments of the present invention will be described in further detail below in conjunction with the accompanying drawings.

[0050] like figure 1 As shown, the present invention provides a construction monitoring system for integral vertical rotation of the main tower, which is used to be installed on the main tower hoisting ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to the technical field of bridge construction monitoring, in particular to a monitoring system and method of the overall vertical rotation construction of a main tower. The monitoring system of the overall vertical rotation construction of the main tower comprises a first large floating crane ship GPS (Global Positioning System), a second large floating crane ship GPS, a maintower positioning device, a first small floating crane ship GPS and a second small floating crane ship GPS, wherein the first large floating crane ship GPS and the second large floating crane ship GPS are respectively arranged on the bow and the stern of a large floating crane ship, and the orientation slope with the large floating crane ship as a base line is calculated by obtaining the coordinates of the bow and the stern of the large floating crane ship; the main tower positioning device is arranged on an upper lifting appliance so as to obtain the coordinate of the main tower and calculate the offset distance of the main tower relative to the base line based on the orientation slope; and the first small floating crane ship GPS and the second small floating crane ship GPS are respectively arranged on the bow and the stern of a small floating crane ship so as to obtain the coordinates of the bow and the stern of the small floating crane ship, and the offset distance of the bow and the stern of the small floating crane ship relative to the base line is calculated based on the orientation slope. The problem of the collision risk because the construction instruction guidance cannotbe performed on the whole vertical rotation process in the prior art can be solved.

Description

technical field [0001] The invention relates to the technical field of bridge construction monitoring, in particular to a construction monitoring system and method for integral vertical rotation of a main tower. Background technique [0002] The steel tower is an important force transmission component of the cable-stayed bridge. Its design and construction are directly related to the safety of the entire cable-stayed bridge. The general conventional steel tower, due to its overall volume and weight, is relatively large. The overall hoisting is more difficult, and the method of segmental assembly is often used. Several segments are hoisted to the installation point in sequence, and then welded and assembled segment by segment at the installation point until a complete steel tower is formed. However, the location and environment of the bridge construction is relatively harsh, and the on-site welding and assembly work is affected by multiple factors including wind, rain, waves,...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): E01D21/08E01D19/14G01B7/004G01B7/02G01B11/02G01B17/00G01C9/00
CPCE01D19/14E01D21/08G01B7/004G01B7/02G01B11/02G01B17/00G01C9/00
Inventor 王梓宇王翔汪正兴邓永锋荆国强吴何马长飞伊建军吴肖波汪泽洋赵龙高天
Owner CHINA RAILWAY MAJOR BRIDGE ENG GRP CO LTD