Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Method for solving coal seam gas outburst

A coal seam gas and gas outburst technology, applied in the field of coal seam gas outburst, to achieve the effect of shortening the gas drainage time, simple process and good drainage effect

Active Publication Date: 2020-12-25
SHANXI XINQIAO TECH CO LTD
View PDF7 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0009] The invention provides a method for solving coal seam gas outburst, which includes the following steps: solving the problem of coal gas outburst in Shimen, when the distance between the head of the Shimen construction and the minimum normal distance of the coal seam is not less than 10 meters, stop the excavation work and start drilling for The pressure measuring hole for measuring the gas pressure. The pressure measuring hole shall be sealed immediately after the construction is completed, and the detection instrument for detecting the gas pressure shall be installed. It is required to drill the first drainage hole, and install the first cracking tube in the first drainage hole according to the design requirements, and then crack the first drainage hole through the first cracking tube. After the fracturing of the first drainage hole is completed, the first drainage pipe is installed to drain the gas; the transportation chute and the return air chute are divided into multiple sections along their respective excavation directions, and the problem of gas outburst in coal roadway excavation is solved in sections. When solving the problem of gas outburst in each section of the coal roadway, along the direction of the coal seam, according to the construction measures of the transportation chute and the return air chute, the excavation working faces of the transportation chute and the return air chute are respectively Drilling the second drainage hole and the third drainage hole, the second drainage hole and the third drainage hole are respectively 60-100 meters ahead of the tunneling face of the transport chute and the return air chute After the construction of the second drainage hole and the third drainage hole is completed, install the second cracking pipe and the third drainage hole respectively in the second drainage hole and the third drainage hole according to the design requirements. Three cracking tubes, and then through the second cracking tube and the third cracking tube to crack the second drainage hole and the third drainage hole respectively, the second drainage hole and the third drainage hole After the fracturing of the third drainage hole is completed, a second drainage pipe and a third drainage pipe are respectively installed in the second drainage hole and the third drainage hole to drain the gas; To solve the problem of gas outburst in the coal mining face, when the length of the coal mining face is 200-300 meters, when the transport chute and the return air chute are opposite to each other along the direction of the coal seam inclination Four drainage holes and the fifth drainage hole, after the construction of the fourth drainage hole and the fifth drainage hole, according to the design requirements in the fourth drainage hole and the fifth drainage hole The fourth cracking tube and the fifth cracking tube are respectively installed inside, and then the fourth drainage hole and the fifth drainage hole are respectively cracked through the fourth cracking tube and the fifth cracking tube , after the fracturing of the fourth drainage hole and the fifth drainage hole is completed, a fourth drainage pipe and a fourth drainage pipe and the fifth drainage hole are respectively installed in the fourth drainage hole and the fifth drainage hole. Five drainage pipes to drain the gas, when the length of the coal mining face is less than 200 meters, the fourth drainage is only carried out along the coal seam inclination along the transport chute to the return air chute hole, after the construction of the fourth drainage hole is completed, a fourth cracking pipe is installed in the fourth drainage hole, and then the fourth drainage hole is cracked through the fourth cracking tube, the After the fracturing of the fourth drainage hole is completed, a fourth drainage pipe is installed in the fourth drainage hole to drain the gas

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Method for solving coal seam gas outburst
  • Method for solving coal seam gas outburst
  • Method for solving coal seam gas outburst

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0023] The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.

[0024] The purpose of the present invention is to provide a time-saving, labor-saving, controllable and effective method for solving coal seam gas outburst.

[0025] In order to make the above objects, features and advantages of the present invention more comprehensible, the present invention will be further described in detail below in conjunction with the accompanying drawings and specific embodiments.

[0026] This embodiment provides a method for solving c...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a method for solving coal seam gas outburst, and relates to the technical field of coal mining. According to the method for solving coal seam gas outburst, a drainage hole is drilled, a fracturing pipe is arranged in the drainage hole to fracture the drainage hole, and the drainage hole is connected with a drainage pipe to drain gas after fracturing is completed. Gas drainage can be completed in a trouble-saving and labor-saving manner, and the gas drainage effect is good and controllable.

Description

technical field [0001] The invention relates to the technical field of coal mining, in particular to a method for solving coal seam gas outburst. Background technique [0002] In the process of coal mining, especially in gas outburst mines, if the gas problem is not properly dealt with, once a gas accident occurs, it will lead to mass casualties and serious accidents. The existing methods for solving coal seam gas outburst mainly have the following defects: [0003] 1. The existing treatment method uses drilling to drain the gas. This method takes a long time to pump the gas, and the gas attenuation is slow, so it is difficult to ensure safe production; [0004] 2. It is time-consuming and labor-intensive to create holes for gas extraction by hydraulic punching, the process is complicated, and the effect is poor; [0005] 3. The hydraulic fracturing method is used to extract gas. During the hydraulic fracturing process, the trajectory generated cannot be controlled and the...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E21F7/00E21B43/00E21B43/263E21B47/06
CPCE21F7/00E21B43/006E21B43/263E21B47/06Y02P90/70
Inventor 汪茂智安永贵
Owner SHANXI XINQIAO TECH CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products