A construction method of asynchronous hydraulic climbing formwork for hollow high piers of pier groups in limited space
A technology with limited space and construction method, applied in the direction of bridges, bridge construction, bridge parts, etc., can solve the problems of not satisfying the synchronous construction of group piers, large construction interference, etc., to improve construction efficiency, avoid jacking collision, and improve construction speed Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0045] The present invention will be further described below in conjunction with accompanying drawing.
[0046] see Figure 1 to Figure 14 , the asynchronous hydraulic formwork climbing construction method of the hollow high pier of the limited space pier group of the present invention adopts the hydraulic formwork climbing system to build the left front pier column 1A, the left rear pier column 1B, the right front pier column 2A and the right rear pier Column 2B, the four piers are all hollow high piers and are separated into the first section to the fourth section inner box by the first to the third transverse partition; the left front pier 1A and the left The distance between the rear pier 1B and the distance between the right front pier 2A and the right rear pier 2B is 5.00m; the distance between the left front pier 1A and the right front pier 2A and the left rear pier 1B The distance from the right rear pier 2B is 5.50m; the left front pier 1A and the left rear pier 1B, ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


