Construction method and application of shield universal segment point selection model
A construction method and a general-purpose technology, which is applied in the construction of a general-purpose segment selection model for shield tunneling, can solve problems such as low point selection efficiency, and achieve the effects of improving efficiency, improving reliability, and ensuring quality.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0045]A method for constructing a general-purpose segment selection model of shield tunnel 100, such asfigure 1 Shown, including:
[0046]Construct a training sample set and train a neural network to obtain a general-purpose segment selection model for shields;
[0047]Among them, the method of obtaining each training sample is:
[0048]S110. Establish shield machine model, segment model and DTA;
[0049]S120. Based on the DTA, randomly determine the coordinates of the corresponding point on the DTA of the last segment of the segment to be assembled, the pose and point position of the last segment of the segment, the coordinates of the corresponding point on the DTA of the shield machine and The current pose of the shield machine;
[0050]S130. Measure or calculate the construction parameters in the current model state according to the pose of the last ring segment and the current pose of the shield machine; and based on the pose and point position of the last ring segment, construction parameters...
Embodiment 2
[0097]A general-purpose shield selection method for segments, including:
[0098]Collect the pose and point position of the last segment of the segment to be assembled during the real-time construction process, the current construction parameters, and the coordinates of the corresponding point of the segment to be assembled on the DTA, and enter a shield as described in the first embodiment above The point-selection model constructed by the method of constructing the universal tube segment selection model obtains the points of the segment to be assembled and completes the selection of the universal segment segment.
[0099]Such asFigure 7As shown, the first is to pre-train the segment automatic point selection model. On this basis, real-time reference data is received. The reference data is the pose and point position of the last segment of the segment to be assembled, current construction parameters, and The coordinates of the corresponding points of the segment to be assembled on the DT...
Embodiment 3
[0103]A computer-readable storage medium, the computer-readable storage medium includes a stored computer program, wherein when the computer program is run by a processor, the device where the storage medium is located is controlled to execute the one described in the first embodiment above. A method for constructing a shield universal segment selection model and / or a shield universal segment selection method as described in the second embodiment. The related technical solutions are the same as in the first embodiment and the second embodiment, and will not be repeated here.