A technology of real-time monitoring and construction method, applied in the direction of formwork/formwork/work frame, instrument, measuring device, etc., can solve the problems of weak supporting system structure, inability to conduct real-time monitoring, waste of formwork and formwork, etc., to reduce the consumption of materials and the input of turnover materials, shorten the construction period, and facilitate the construction.

Inactive Publication Date: 2021-02-12
中如建工集团有限公司
View PDF5 Cites 5 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] The technical problem to be solved by the present invention is to provide a construction method for the real-time monitoring system of the intelligent construction site buckle early disassembly support, which can solve the problem that the formwork cannot be removed for a long time, resulting in large formwork waste, weak support system structure, and real-time monitoring cannot be carried out if the support system is deformed The problem

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction method of intelligent construction site frog early-dismantling support real-time monitoring system
  • Construction method of intelligent construction site frog early-dismantling support real-time monitoring system
  • Construction method of intelligent construction site frog early-dismantling support real-time monitoring system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0038] In order to make the object, technical solution and advantages of the present invention clearer, the present invention will be further described in detail below in conjunction with the accompanying drawings and specific embodiments. The following examples can enable those skilled in the art to understand the present invention more comprehensively, but the present invention is not limited to the scope of the described examples.

[0039] Such as figure 1 As shown, the specific implementation mode adopts the following technical scheme: comprising the following steps:

[0040] S1. Measuring and setting out: Pop out the vertical and horizontal positioning lines in the center of the vertical pole of the frame body on the base layer, and place the vertical pole at the intersection of the vertical and horizontal positioning lines. For the base layer whose flatness does not meet the requirements, set the adjustment base for leveling. According to the structural elevation, the i...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a construction method of an intelligent construction site frog early-dismantling support real-time monitoring system. The construction method comprises the following steps of surveying and setting out, support system installation, double-nut early-dismantling head installation, primary beam and secondary beam installation, early-dismantling support real-time monitoring system installation, formwork installation and acceptance, rebar installation and acceptance, concrete pouring and maintenance and formwork dismantling. The construction method has the advantages that a socket-type frog type steel pipe support is adopted, a double-nut early-dismantling head is arranged at the top of a vertical rod, and the construction method has the characteristics of being flexiblein arrangement, safe, reliable and convenient and quick to construct; a primary beam, a secondary beam and a formwork can be repeatedly used in a turnover mode, the turnover efficiency is improved, investment of consumed materials such as the formwork and turnover materials is reduced, accordingly the cost is reduced, and the construction period is shortened; and the early-dismantling support real-time monitoring system can achieve frame body deformation monitoring and alarming, the safety and stability of formwork support are ensured, if the early-dismantling support real-time monitoring system is applied and popularized in a large area, the total social demand of related materials can be reduced, and loss of materials such as steel and frogs is reduced.

Description

technical field [0001] The invention relates to the technical field of building construction, in particular to a construction method of a real-time monitoring system for early dismantling of supports on smart construction sites. Background technique [0002] At present, urban underground plazas, shopping malls, parking garages and other buildings are generally characterized by large single-storey building areas and large spans. Considering the impact of load transfer on the support and floor structure when the multi-storey floor is continuously supported, in general, the upper structure is not constructed, and the support system of the lower structure cannot be dismantled. In the actual construction process, a large amount of consumable materials such as formwork and square wood are often invested, and the formwork cannot be removed for a long time, resulting in a large waste of formwork. In addition, there are often reports of supporting system accidents, which pose a grea...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): E04G11/48E04G21/00G01D21/02
CPCE04G11/48E04G21/00G01D21/02
Inventor 宋小忠江林张亚民江婷婷江升丁蓉蓉闵悦
Owner 中如建工集团有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products