Continuous beam No.0 block reinforced concrete-filled steel tube support erecting and dismantling method

A technology of steel pipe concrete and concrete, which is applied in the field of bridge construction, and can solve the problems of self-heavy installation and dismantling, self-heaviness, troubles, etc.

Inactive Publication Date: 2021-02-26
CHINA RAILWAY NO 3 GRP CO LTD +1
View PDF18 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] The existing No. 0 block has a wider cross-section and larger self-weight. In order to ensure the safety of the construction, the external temporary consolidated steel pipe concrete support of the No. 0 section is supported by a φ2m steel pipe, and plain concrete is poured in the pipe, directly from the top of the cap to the bottom of the beam of the No. 0 block. This method of erection and dismantling is very troublesome when installing and dismantling it because the No. 0 block has a wider cross-section and greater self-weight.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0023] Step 1. Measurement and setting-out: The measurement and setting-out personnel should conduct detailed technical disclosure for inspection, and then use the measurement and setting-out tool to perform measurement and setting-out at the designated position. fix.

[0024] Step 2. Leveling and brushing the isolation layer: After determining the position, manually use concrete to level the position supported by the cap, and after leveling, manually brush the isolation layer at the erected position.

[0025] Step 3. Install the steel pipe: After installing the first section of 180cm steel pipe, pour plain concrete inside the steel pipe. After the final setting, install the 20cm high steel pipe and pour sulfur mortar. The resistance wire is buried in the sulfur mortar. The 180cm steel pipe and the 20cm high steel pipe are used as the One group, follow this procedure to install from bottom to top, the steel pipe concrete is built to the bottom of the beam of No. Steel pipe wi...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention provides a continuous beam No.0 block reinforced concrete-filled steel tube support erecting and dismantling method, and relates to the technical field of bridge construction. The continuous beam No.0 block reinforced concrete-filled steel tube support erecting and dismantling method comprises the following steps of S1, surveying and setting out, S2, leveling and brushing an isolation layer, S3, installing a steel tube, S4, pre-burying a U-shaped steel bar, S5, dismantling the steel tube, S6, installing a hoop, S7, melting sulfur mortar, and S8, sequentially dismantling all sections of formworks and plain concrete from top to bottom according to the method till the concrete-filled steel tube support is temporarily solidified. According to the erecting and dismantling method for the reinforced concrete-filled steel tube support of the No.0 block of the continuous beam, the method that the semicircular steel tubes are spliced in a multi-section mode and the sections are filled with the sulfur mortar is adopted, and the temporarily-solidified concrete-filled steel tube support can be easily, conveniently and rapidly installed and dismantled.

Description

technical field [0001] The invention relates to the technical field of bridge construction, in particular to a method for erecting and removing a continuous beam No. 0 block reinforced concrete-filled steel tube support. Background technique [0002] Block 0 is generally called the first block of the Hanging Basket Bridge. On the pier body of the main pier, block 1, block 2, etc. can be constructed after the construction of block 0, which is divided into side spans and The middle span, when the side spans are finally closed and the middle span is closed, like a hanging basket bridge, if the left and right sides are divided, there are generally four piers, which means that there are 4 No. 0 blocks, 8 No. 1 blocks, etc., and the existing continuous The beam arch is designed as a single-box double-chamber structure, and 0# blocks must be poured on the top of the pier before the hanging blue can be installed. The 0# block needs to be erected to be poured. The shape of block 0#...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E01D21/00
CPCE01D21/00
Inventor 刘承宏马良陈宇博王颖梅张远征纪长永张博轩白文清王胜泉
Owner CHINA RAILWAY NO 3 GRP CO LTD