Intelligent construction site management system based on BIM model

A management system and construction site technology, applied in data processing applications, special data processing applications, instruments, etc., can solve the problems of inconvenience, low management efficiency, and inability to carry out centralized management, and achieve the effect of improving management efficiency.

Inactive Publication Date: 2021-03-12
BINZHOU UNIV
View PDF8 Cites 6 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] In the existing technology, manual management is generally adopted. Although some management systems have appeared, most of them are independent systems; for example, personnel management and equipment monitoring are displayed and applied separately in two systems. Relevant personnel need to understand the entire project, and need to operate and view multiple systems separately, and centralized management cannot be performed, which in turn causes defects such as inconvenient use and low management efficiency

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Intelligent construction site management system based on BIM model

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0022] In order to make the objects and advantages of the present invention clearer, the present invention will be further described in detail below in conjunction with the examples. It should be understood that the specific embodiments described here are only used to explain the present invention, not to limit the present invention.

[0023] Such as figure 1 As shown, the embodiment of the present invention provides a smart construction site management system based on the BIM model, including:

[0024] The BIM model building module is used to generate the construction site management rules corresponding to each construction node according to the approved construction route, and then construct the BIM building information model corresponding to each construction node according to the approved construction route and its corresponding construction site management rules; The BIM building information model corresponding to each construction node contains the corresponding site ma...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to the field of construction site management, in particular to an intelligent construction site management system based on a BIM model. The system comprises a BIM construction module, a construction site monitoring module, a construction site management module and a deviation data analysis module, and is characterized in that the BIM construction module generates a construction site management rule corresponding to each construction node according to an approved construction line, and then constructing a BIM building information model corresponding to each construction node according to the approved construction line and the corresponding construction site management rule, and the construction site management module is used for generating a construction site state parameter set corresponding to each construction node and generating a comparison result corresponding to each parameter by comparing the construction site state parameter set with the BIM building information model. According to the invention, visual intelligent management of the construction site is realized, the construction site management efficiency can be improved, and deviation and dangerous factors existing in the construction process can be discovered in time.

Description

technical field [0001] The invention relates to the field of construction site management, in particular to a smart construction site management system based on a BIM model. Background technique [0002] In the construction process of housing construction, the reasonable application of the whole process management mode can manage the whole process of construction and provide guarantee for the construction of the project. However, in the process of building construction, it involves a wide range of types of work, and there are many nodes that need to be managed and monitored. It needs to be managed from multiple aspects such as personnel, materials, equipment, safety, progress, and quality. [0003] In the existing technology, manual management is generally adopted. Although some management systems have appeared, most of them are independent systems; for example, personnel management and equipment monitoring are displayed and applied separately in two systems. To understand ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): G06Q50/08G06F30/13G06F30/20
CPCG06Q50/08G06F30/13G06F30/20
Inventor 张茜茜
Owner BINZHOU UNIV