Construction process optimization method and system based on fatigue

An optimization method and fatigue technology, applied in office automation, instruments, data processing applications, etc., can solve the problems of no optimization and can not effectively reduce the fatigue of construction personnel, and achieve the effect of alleviating fatigue

Inactive Publication Date: 2021-03-16
HANGZHOU HOUBO TECH CO LTD
View PDF3 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, there is no technical plan to optimize the construction process from the perspective of the fatigue degree brought by the construction process to the construction personnel, and the fatigue degree of the construction personnel cannot be effectively alleviated.
At present, there is no technical solution to effectively optimize the construction process according to the strength and / or connection and / or duration of the construction process to the construction personnel's fatigue. Therefore, a fatigue-based construction process optimization method and system are proposed.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction process optimization method and system based on fatigue
  • Construction process optimization method and system based on fatigue
  • Construction process optimization method and system based on fatigue

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0038] The preferred embodiment of the present invention will be described in detail below.

[0039] The present invention relies on the positioning device and the imaging device. The construction personnel of the present invention can be applied to different application scenarios, such as interior decoration, community maintenance, construction site, repair bridge repair path, etc., for different application scenarios, to obtain intensity information of construction staff construction processes , Connection information, mode of working time, different ways.

[0040] Embodiments of the method of fatigue-based construction step optimization method, flow charts such as figure 1 As shown, it is characterized in that:

[0041] Decompose the construction project into multiple construction steps;

[0042] Get the intensity information, connection information, and work time information of the construction process;

[0043] The construction step is optimized according to the strength of ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a construction process optimization method and system based on fatigue. The method comprises the steps: decomposing a construction project into a plurality of construction processes; acquiring strength information, connection information and working duration information of the construction process; and optimizing the construction process according to the strength of the construction process and / or the relationship between the connection and / or working duration and the fatigue. According to the invention, the problem of how to effectively optimize the construction process according to the fatigue of constructors caused by the strength and / or connection and / or duration of the construction process is solved.

Description

Technical field [0001] The present invention belongs to the field of intelligent construction, and more particularly to a method and system based on fatigue-based construction step optimization. Background technique [0002] Construction personnel construction process is mainly based on experience or according to the construction standard or according to material characteristics. The current technical solution on the construction process is mainly the construction process and construction method related to a specific project or material processing, such as the "deep foundation and pile-reserved channel construction law" of the public "deep foundation and pile-reserved channel construction law" in the public, such as the publication of CN1072981A. Good upper soil layer, excavation of existing mechanical equipment and drilling construction base, upper part of the pile, and reserve the channel, then use the steel drill rod smaller than the reserved channel diameter by reserved chann...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/04G06Q10/06G06Q10/10G06Q50/08
CPCG06Q10/04G06Q10/06316G06Q10/1097G06Q50/08
Inventor 严军荣卢玉龙祝嘉祺
Owner HANGZHOU HOUBO TECH CO LTD
Features
  • R&D
  • Intellectual Property
  • Life Sciences
  • Materials
  • Tech Scout
Why Patsnap Eureka
  • Unparalleled Data Quality
  • Higher Quality Content
  • 60% Fewer Hallucinations
Social media
Patsnap Eureka Blog
Learn More