Nuclear power station spare part purchasing demand date optimization method and computer
An optimization method and technology for nuclear power plants, applied in computing, instrumentation, business, etc., can solve the problems of scattered demand, large amount of coding, increase the risk of inventory backlog, etc., to achieve the effect of accurate demand date and improve management efficiency
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 2
[0044] The computer in this embodiment includes a memory and a processor; the memory is used to store computer programs; and the processor is used to execute the computer programs in the memory to implement the method for optimizing the procurement demand date of nuclear power plant spare parts as in Embodiment 1 above.
Embodiment 3
[0046] refer to Figure 2 to Figure 4 , the demand date setting needs to consider the reserved quantity on site (required quantity for on-site maintenance work) and the reserved demand date (required date for on-site maintenance work). For spare parts with reserved quantity, the demand date needs to be combined with the current inventory quantity and the correct order quantity And inventory parameter setting, for some spare parts purchase application demand date without reserved quantity, factors such as frequency of use, importance of spare parts and other factors need to be considered in setting.
[0047]Although there is no need for on-site maintenance work in the purchase application for unreserved spare parts, failures may still occur and replacements may occur. At the same time, spare parts with high frequency of use and spare parts with low frequency of use, and spare parts with high importance and low importance have different priorities. For spare parts with high freq...