Analysis and early warning method, system, terminal and medium for units crossing the vibration zone
A vibration area and unit technology, applied in the field of data processing, can solve problems such as major fault operation risk, lack of mining utilization, and lack of technical treatment measures, so as to improve the service life of equipment, reduce the occurrence rate of defects and equipment damage, and save money Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0049] Embodiment 1: The analysis and early warning method for the unit crossing the vibration area, such as figure 1 As shown, it is specifically implemented by the following steps.
[0050] Step 1: After obtaining the real-time operation data of the unit equipment, a real-time database is established.
[0051] The real-time operation data includes the first-level data obtained by real-time collection of watershed equipment operation data, the second-level data obtained by real-time collection of power station operation data, the third-level data obtained by real-time collection of power station unit operation data, and the fourth-level data obtained by real-time collection of unit operation data .
[0052] Step 2: Input the real-time operation data in the real-time database into the pre-built real-time data analysis model and analyze to obtain the cross-vibration zone data and actual early warning information.
[0053] Such as figure 2 As shown, the real-time data analys...
Embodiment 2
[0064] Embodiment 2: The unit crosses the vibration zone analysis and early warning system, such as image 3 As shown, it includes data collection module, data analysis module, database building module, model building module, evaluation module and early warning module.
[0065] Among them, the data acquisition module is used to obtain the real-time operation data of the unit equipment and then establish a real-time database. The data analysis module is used to input the real-time operation data in the real-time database into the pre-built real-time data analysis model, and then analyze and obtain the cross-vibration zone data and actual early warning information. The database establishment module is used to obtain the real-time operation data that has participated in the data analysis within the preset analysis period and then establish the historical database. The model building module is used for building a historical data model according to the historical database. The ev...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com