Cascade hydropower multi-stage optimization scheduling method
An optimized scheduling and multi-stage technology, applied in data processing applications, instruments, forecasting, etc., can solve the ecological environment damage in the watershed, the lack of consideration of dam ecological protection and reservoir water environment protection, and the lack of unified water resource scheduling and management systems And other issues
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0053] The present invention will be further described below in conjunction with specific embodiments.
[0054] A cascaded hydropower multi-stage optimal scheduling method, comprising the following steps:
[0055] (1) Establish a model with the max-min mathematical algorithm, determine each single objective function, including the first objective function, the second objective function, the third objective function and the fourth objective function, and obtain the initial optimal scheduling benefit;
[0056] (2) Establish a model with a risk assessment algorithm, determine each single objective function, including the first objective function, the second objective function, the third objective function and the fourth objective function, and obtain the predicted hydroelectric flow trend;
[0057] (3) Combining the benefits of initial optimal scheduling in step (1) and the forecasted hydropower flow trend in step (2), considering the daily optimal scheduling of water flow delays...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 

