Main-tower-free cable-stayed bridge suitable for wide and deep canyons and construction scheme
A technology for cable-stayed bridges and canyons, applied in the field of cable-stayed bridges without main towers and construction schemes, can solve problems such as difficulties in erecting the main towers of cable-stayed bridges, and achieve the effects of shortening the construction period, reducing project cost, and reducing difficulty
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0044] Such as Figure 1 to Figure 5 Shown, a kind of construction scheme of the main tower cable-stayed bridge that the present invention is applicable to wide and deep canyons, comprises following construction steps:
[0045] Step 1: construction of the inclined shaft 5, after the construction of the main line of the tunnel at both ends of the canyon is completed, an inclined shaft 5 is opened on both sides of the tunnel entrance at the two ends;
[0046] Step 2: Construction of the anchoring body 4, after the construction of the inclined shaft 5 is completed, pouring of the anchoring body 4 at the port of the inclined shaft 5;
[0047] Step 3: Install the tunnel anchor 3. After the construction of the anchor body 4 is completed, the anchor structure 32 of the tunnel anchor 3 is fixedly installed in the anchor body 4, and then the anchor structure 31 and the anchor structure 32 are connected through the bolt group 33 fixed;
[0048] Step 4: Install the main beam 1 and the ...
Embodiment 2
[0050] Such as Figure 1 to Figure 5As shown, a cable-stayed bridge without a main tower suitable for wide and deep canyons, its working principle is: the cable-stayed cable 2 is anchored into the mountain body by setting the tunnel anchor 3, and the anchor body 4 arranged in the mountain body is connected with the tunnel anchor. Used together, the cable-stayed cables 2 are fixed to provide tension for suspension and fixing of the main girder 1 to ensure the basic functions of the cable-stayed bridge without a main tower, thereby replacing the main tower of the cable-stayed bridge. This method can reduce construction difficulty and engineering cost. Among them, the combination of the inclined shaft 5 and the tunnel can provide a working space for the anchoring operation, and at the same time, it can facilitate the passage of construction personnel, equipment and materials. A cable-stayed bridge without a main tower includes a main girder 1, a cable-stayed cable 2, a tunnel anc...
PUM

Abstract
Description
Claims
Application Information

- Generate Ideas
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com