A construction method of a drainage system for preventing leakage of the bottom plate of a tunnel structure

A drainage system and tunnel structure technology, applied in drainage, earth square drilling, mining equipment, etc., can solve problems such as difficult to accurately find water leakage points, hard to cure, etc., and achieve high surface water permeability, low price, and good performance.

Active Publication Date: 2022-04-19
中铁城建集团第三工程有限公司 +2
View PDF7 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

After opening to traffic, the leakage water that can be observed by the naked eye can basically be treated by plugging, but it is difficult to accurately find the leakage point and cure the leakage of the bottom plate, so the measures to prevent water leakage are particularly critical

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0027] A construction method of a drainage system for preventing leakage of the bottom plate of a tunnel structure, including a drainage blind pipe, a U-shaped pipe clamp and a PVC elbow;

[0028] The specific construction steps are as follows:

[0029] Step 1: Drainage system pipe network design: According to the engineering building, structural construction drawing, drainage construction drawing; mark and number the expansion joints of the tunnel floor, longitudinal construction joints, horizontal construction joints and other parts prone to water leakage; Arrange the location of the drainage blind pipe, enter the elevation measurement, design the drainage direction and drainage path; determine the plane position of the main pipe and branch pipes, number each pipe and mark the mileage position;

[0030] Step 2: Pipeline installation: refer to the designed drainage system drawing to prevent leakage of the bottom plate of the tunnel structure, and install the pipeline;

[003...

Embodiment 2

[0044] A construction method of a drainage system for preventing leakage of the bottom plate of a tunnel structure, including a drainage blind pipe, a U-shaped pipe clamp and a PVC elbow;

[0045] The specific construction steps are as follows:

[0046] Step 1: Drainage system pipe network design: According to the engineering building, structural construction drawing, drainage construction drawing; mark and number the expansion joints of the tunnel floor, longitudinal construction joints, horizontal construction joints and other parts prone to water leakage; Arrange the location of the drainage blind pipe, enter the elevation measurement, design the drainage direction and drainage path; determine the plane position of the main pipe and branch pipes, number each pipe and mark the mileage position;

[0047] Step 2: Pipeline installation: refer to the designed drainage system drawing to prevent leakage of the bottom plate of the tunnel structure, and install the pipeline;

[004...

Embodiment 3

[0061] A construction method of a drainage system for preventing leakage of the bottom plate of a tunnel structure, including a drainage blind pipe, a U-shaped pipe clamp and a PVC elbow;

[0062] The specific construction steps are as follows:

[0063] Step 1: Drainage system pipe network design: According to the engineering building, structural construction drawing, drainage construction drawing; mark and number the expansion joints of the tunnel floor, longitudinal construction joints, horizontal construction joints and other parts prone to water leakage; Arrange the location of the drainage blind pipe, enter the elevation measurement, design the drainage direction and drainage path; determine the plane position of the main pipe and branch pipes, number each pipe and mark the mileage position;

[0064] Step 2: Pipeline installation: According to the engineering building, structural construction drawings, and drainage construction drawings, mark and number the expansion join...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a construction method of a drainage system for preventing leakage of the bottom plate of a tunnel structure, including drainage blind pipes, U-shaped pipe clamps and PVC elbows; the design of the drainage system pipe network: according to engineering buildings, structural construction drawings, drainage Construction drawings; mark and number the tunnel floor expansion joints, longitudinal construction joints, horizontal construction joints and other parts prone to water leakage; carry out elevation measurement for the positions where drainage blind pipes need to be arranged, and design the drainage direction and drainage path; Determine the plane position of the main pipeline and branch pipes, number each pipeline and mark the mileage position; pipeline installation: refer to the designed drainage system drawing to prevent leakage of the tunnel structure floor and water upside down. It can effectively prevent the water leakage from the bottom plate from going up to the structural layer, and use the drainage system to drain the leaking water to the pump room, reduce the treatment cost of the damage to the asphalt structural layer caused by water leakage, and save the cost of plugging and maintenance.

Description

technical field [0001] The invention belongs to the field of tunnel drainage, and in particular relates to a construction method of a drainage system for preventing leakage of the bottom plate of a tunnel structure. Background technique [0002] Tunnel engineering is widely used in projects such as urban expressways, high-speed railways, rail transit, subways, etc. Leakage of underground structures is also a common quality problem in tunnel engineering, and it is also a technical problem. Nowadays, almost all large and small tunnels in China have leakage water condition, [0003] For tunnel water leakage, prevention is usually the main priority, followed by sealing, and then drainage and drainage. After opening to traffic, the leakage water that can be observed by the naked eye can basically be treated by plugging, but it is difficult to accurately find the leakage point and cure the leakage of the bottom plate, so the measures to prevent water leakage are particularly crit...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E21F16/02E21F17/00
CPCE21F16/02E21F17/00
Inventor 艾东生李娜侯传彦杨硕孙启志程宇
Owner 中铁城建集团第三工程有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products