A technology of prefabricated wall panels and hoisting tools, which is applied in the processing of building materials, construction, building construction, etc., can solve the problems of low construction quality and efficiency, low education level, low construction quality, etc., and achieve the improvement of construction quality and construction quality. Efficiency, improving efficiency and quality, improving the effect of construction quality
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0050] The prefabricated wall panel hoisting method includes the following steps:
[0051] The first step is to connect the lifting ring 1102 of the prefabricated wall panel hoisting tool to the tower crane;
[0052] The second step is to determine the hoisting fixing hole 100 of the prefabricated wall panel 1 to be hoisted;
[0053] According to the hoisting connection position on the hoisting connection section steel 1101 of the prefabricated wall panel hoisting tool, the corresponding hoisting fixing holes 100 are reserved during the production process of the prefabricated wall panel 1 to be hoisted;
[0054] In the third step, the prefabricated wall panels 1 to be hoisted are laid out for construction;
[0055] According to the construction drawing, carry out the construction line-out of the corresponding position of each prefabricated wall panel 1;
[0056] The fourth step is to install auxiliary installation tools for prefabricated wall panels;
[0057] The plane outl...
Embodiment 2
[0061] The prefabricated wall panel hoisting method of Embodiment 1 can also be more specific, including the following steps:
[0062] The first step is to make and install prefabricated wall panel hoisting tools,
[0063] The prefabricated wall panel hoisting tool includes two sets of hoisting connecting sections 1101 and three-level sliding components from bottom to top; the four-piece in-line hoisting connecting section steel 1101 includes eight circular hoisting connecting holes 1109, of which the four hoisting connecting holes 1109 are one Each group of hoisting connection holes 1109 is distributed in a square into two rows, a total of four rows; a group of two circular sliding block connection holes are set on the top of the hoisting connection section steel 1101, and every two pieces of hoisting connection section steel 1101 as a group is fixedly connected to the first sliding block 1103-1 and the second sliding block 1103-2 through connecting bolts 1108, and the top of...
Embodiment 3
[0096] The hoisting method of the prefabricated wall panel in Embodiment 1 or Embodiment 2 may be more specific. In the fifth step, when hoisting and installing the prefabricated wall panel 1, the following steps may also be included:
[0097] Connect the two hoisting ropes 1110 on the prefabricated wall panel hoisting tool to the tower crane hook;
[0098] The ground technician instructs the tower crane driver to operate the tower crane to move the prefabricated wall panel hoisting tool to the top of the prefabricated wall panel 1 to be hoisted. 1 position alignment;
[0099] The ground technician uses the controller to control the first rotating motor 1107-1 to drive the first sliding block 1103-1 and the second sliding block 1103-2 to move to the position where the hoisting fixing holes 100 at both ends in the length direction of the prefabricated wall panel 1 to be hoisted are connected. The position of the vertical line;
[0100] The ground technician uses the controlle...