Main roof breaking span control method and application thereof
A control method and breaking technology, which is applied in earth drilling, discharge machinery, ground mining, etc., can solve the problem of long initial breaking steps of old roofs, reduce the area of overhanging roofs, broaden application prospects, promote early formation and The effect of development
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0045] In the embodiment of the present invention, in order to solve the problem that during the initial mining and initial laying of the working face, a large energy impact is induced due to the long initial breaking step distance of the old roof, which threatens the safe production of the working face, a kind of old roof breaking step distance control is proposed. The method is specifically a method for controlling the initial breaking step distance of the old roof of the working face when mining a coal mine, which includes the following steps:
[0046] Step 1, the first blast hole, the second blast hole, the third blast hole, and the fourth blast hole are respectively set on the O-X type fracture plane structure of the rock formation (coal seam) to be broken; wherein, the rock layer to be broken is provided with a transport passage ( That is, the transportation lane, the transportation trough) and the return air channel (ie the return air lane, the return air chute).
[004...
Embodiment 2
[0053] A method for controlling the breaking step distance of the old roof, specifically a method for controlling the first breaking step distance of the old roof of the working face when mining coal mines. The actual operation location is in the 2501 mining area of Huating Coal Mine, and specifically includes the following steps:
[0054] Step 1, the first blast hole, the second blast hole, the third blast hole, and the fourth blast hole are respectively set on the O-X type breaking plane structure of the rock formation (coal seam) to be broken; wherein, the rock layer to be broken is provided with a transport passage and Return air channel.
[0055] Step 2: install explosives in the first blast hole, the second blast hole, the third blast hole and the fourth blast hole respectively, and detonate the explosives to create the center line in the fracture plane structure, thereby forming the fracture plane structure in advance and shortening the initial Breaking step. Among t...
Embodiment 3
[0062] Compared with Embodiment 1, in the embodiment of the present invention, there are mainly three holes in each group of pre-splitting blasting deep holes 18 on the top plate of the cut-out section along the return air flow. Firstly, a hole is arranged in the direction of the vertical roadway on the outer side of the return air trough 10, and the hole is inclined to the side of the triangular coal pillar 9; secondly, a hole is arranged on the top of the roadway vertically to the direction of the roadway, facing the F-shaped structure 17 long arm stress section In the middle; finally, a hole is arranged in the direction of the vertical roadway on the side close to the working face.