Construction method for pipe jacking connection in current well

A construction method and current technology, applied in the field of pipe jacking in the current well, can solve the problems of inability to stop water for a long time and increase technical difficulty, and achieve the effects of shortening the construction period, convenient construction and good construction environment

Pending Publication Date: 2021-07-27
SDC WATERWAY CONSTR
View PDF4 Cites 1 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

In addition, due to the need for drainage in the urban pipe network, for the dry pipe wells involved in drainage, it is common for old wells to be connected to the construction period that the water cannot be cut off for a long time, which greatly increases the technical difficulty of construction.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction method for pipe jacking connection in current well
  • Construction method for pipe jacking connection in current well

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0022] The present invention will be further described in detail below in conjunction with the accompanying drawings and embodiments.

[0023] Such as figure 1 with figure 2 As shown, the current construction method for pipe jacking in a well in this embodiment specifically includes the following steps.

[0024] Step 1. Carry out construction reconnaissance and diving exploration.

[0025] Specifically, under the premise of taking sufficient safety measures to protect, professional divers can be dispatched to sneak into the underground of the existing well 4, and carry out exploration and recording of the size, quantity, and distribution position of the existing pipeline 5 next to the existing well 4, and make a detailed analysis of the existing wells. Downhole silt conditions are simultaneously explored and recorded.

[0026] Step 2. Carry out the removal of the roof and shaft of the existing well 4.

[0027] Usually the roof of the existing well 4 is closed and a well s...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to a construction method for pipe jacking connection in a current well. The construction method is characterized in that an upstream drainage pipe is inserted into an existing current pipeline connected with an upstream well, and a downstream drainage pipe is inserted into an existing current pipeline connected with a downstream well; a dilatation drainage tank is arranged in the current well, and the upstream drainage pipe and the downstream drainage pipe are connected with the dilatation drainage tank; sewage in the current well is discharged, and sludge in the current well is cleared until a water-free operation environment is formed in the current well; and pipe jacking construction relative to the current well is carried out at the set position, and pipe jacking connection in the current well is completed. According to the construction method for pipe jacking connection in the current well, the water-free operation environment can be provided for construction of new pipe jacking connection in the current well, so that the construction is convenient; in the construction process, water does not need to be cut off, and normal use of the current well is not influenced; and due to the good construction environment, the construction period can be effectively shortened, and the construction cost is greatly reduced.

Description

technical field [0001] The invention relates to a construction method for pipe jacking in a well at present. Background technique [0002] Pipe jacking technology is a non-excavation pipe laying construction technology used in municipal construction. Its advantages are that it does not affect the surrounding environment or has little impact, the construction site is small, the noise is low, and it can work deep underground. Tube incomparable advantages. [0003] With the continuous acceleration of the urban modernization process, we often encounter the problem of reconstruction and expansion of urban drainage pipe network. Pipeline connection in old wells may involve underwater construction, well wall removal, etc. It has always been a difficult and dangerous task in drainage engineering. Considering the status quo, the old well has been in use for many years, with serious siltation, and the water level in the well is high all the year round. In addition, due to the need ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): E03F3/06
CPCE03F3/06
Inventor 张斌姜聪宇刘小千徐快乐侯飞罗平李家宜赵金伟刘晓壮
Owner SDC WATERWAY CONSTR
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products