Unlock instant, AI-driven research and patent intelligence for your innovation.

Prefabricated cable duct bank and construction method thereof

A technology for cable ducting and prefabrication, which is used in cable installation, ground cable installation, artificial islands, etc., can solve problems such as inability to guarantee construction quality, large impact on road traffic, noise and dust pollution, etc., and achieve waterproof and anti-erosion effects. Good, guaranteed construction quality, cost-saving effect

Pending Publication Date: 2021-08-27
JINHUA ELECTRIC POWER DESIGN INST CO LTD +1
View PDF5 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

This traditional way of construction site excavation and material stacking occupies a large area, requires a lot of manpower, and has a large workload. The mold making is labor-intensive and time-consuming, and it is difficult to reuse. The construction period is long and the construction quality cannot be guaranteed; noise and dust are generated during construction. Pollution has a great impact on road traffic and brings inconvenience to the daily life of the public

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Prefabricated cable duct bank and construction method thereof
  • Prefabricated cable duct bank and construction method thereof
  • Prefabricated cable duct bank and construction method thereof

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0051] The construction method of a prefabricated cable duct described in the first embodiment, the steps are as follows:

[0052] (1) Excavate the foundation trench, lay the cushion and level it;

[0053] (2) Pre-hoisting slab-type precast concrete components to the construction site;

[0054] (3) Laying out and positioning the assembly position in the base groove;

[0055] (4) Hoist the first slab-type precast concrete component on the first floor, and gently drop it to the position. The slab-type precast concrete components are connected and glued with pipe joint sleeves, and the first-floor slab-type precast concrete components are laid in sequence;

[0056] (5) Hoisting the second layer of slab-type precast concrete components, the adjacent upper and lower slab-type precast concrete components are staggered and connected, and connected by bolts. Use pipe joint casing adhesive connection, and lay the second layer of slab prefabricated concrete members in sequence;

[00...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a prefabricated cable duct bank and a construction method thereof. The prefabricated cable duct bank comprises at least two layers of plate-type prefabricated concrete members, each layer of plate-type prefabricated concrete member is formed by splicing a plurality of plate-type prefabricated concrete members which are in butt joint in the length direction, during construction, the first layer of plate-type prefabricated concrete member is hoisted firstly and gently falls to a positioning position, and the plate-type prefabricated concrete members are connected and glued by using pipe joint sleeves; then, the second layer of plate-type prefabricated concrete member is hoisted, the adjacent upper and lower layers of plate-type prefabricated concrete members are in staggered lap joint and are fastened and connected through bolts, and the end parts of protection pipe joints in the two adjacent plate-type prefabricated concrete members are connected through pipe joint sleeves in an adhesive manner; and in the same way, the other multiple layers of plate-type prefabricated concrete members are laid in sequence. The prefabricated cable duct bank is convenient to construct, good in integrity, high in stability and good in waterproof and anti-erosion effect, noise pollution and environmental influence of field operation are reduced, the requirement for field personnel is reduced, and cost is greatly saved.

Description

technical field [0001] The invention relates to electric power pipeline technology, in particular to a prefabricated cable pipe arrangement and a construction method thereof. Background technique [0002] With the development of social economy and power grid technology, overhead transmission lines are limited by landscape and path conditions, and power cables are gradually shifted from aerial erection to underground laying. [0003] The traditional cable laying, especially the laying of multiple cables, generally adopts the form of cable pipes. The foundation trench is excavated on site, the special cable pipes are laid, and then concrete is poured for curing. This traditional way of construction site excavation and material stacking occupies a large area, requires a lot of manpower, and has a large workload. The mold making is labor-intensive and time-consuming, and it is difficult to reuse. The construction period is long and the construction quality cannot be guaranteed; ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E02D29/045H02G9/02
CPCE02D29/10H02G9/025E02D2300/002E02D2600/20
Inventor 麻坚马宇辉杨运国李文武陈荣健范震凯吴成舟徐刚陈超
Owner JINHUA ELECTRIC POWER DESIGN INST CO LTD
Features
  • R&D
  • Intellectual Property
  • Life Sciences
  • Materials
  • Tech Scout
Why Patsnap Eureka
  • Unparalleled Data Quality
  • Higher Quality Content
  • 60% Fewer Hallucinations
Social media
Patsnap Eureka Blog
Learn More