A technology of soft soil foundation and construction device, which is applied in basic structure engineering, soil protection, construction, etc., can solve the problems of inclined settlement of compacted piles, reduce strength, affect the effect of compacted piles to strengthen soft soil foundation, etc. Bearing capacity and stability, improving integrity and integrity, increasing the effect of contact surfaces
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0031] A construction device for compaction piles reinforced on soft ground provided by the present invention has a hole-forming pile tube 1 and a piling mechanism 2. The pile-driving mechanism 2 is located above the hole-forming pile tube 1 and is used for hammering the hole-forming pile tube 1. Until the hole-forming pile pipe 1 sinks into the target position, it also includes:
[0032] The hammering mechanism 3 is arranged coaxially with the hole-forming pile pipe 1, and can enter into the hole-forming pile pipe 1;
[0033] Compacting mechanism 4, including
[0034] The first bearing platform 41 is located inside the hole-forming pile pipe 1, and its bottom is provided with a first connecting shaft 43, and the hammering mechanism 3 can enter the hole-forming pile pipe 1 to hammer the first bearing platform 41;
[0035] Pile bottom tamping hammer 42 is located inside the hole-forming pile pipe 1 and is used to compact the soil in the hole-forming pile pipe 1. The top is pro...
Embodiment 2
[0040]On the basis of Example 1, it may appear that during the piling process, the side hole of the upper layer will be damaged under the action of vibration, and the impact of the horizontal impact hammer 47, which cannot ensure that the dust can be densely filled after filling the lime soil in the later stage In the side hole, therefore, on the basis of Embodiment 1, the present embodiment is provided with an inlet and outlet channel 7 corresponding to each horizontal impact hammer 47 one-to-one on the hole forming pile pipe 1, and the inlet and outlet channel 7 is connected with a material delivery channel 8, The feeding channel 8 is connected with a feeding device 9 . The access channel 7 is not only used as the access channel of the horizontal impact hammer 47, but also as the conveying channel of the material delivery channel 8. By filling the gray soil immediately after the horizontal side hole is formed, the displacement of the soil on the side wall due to the vibration...
Embodiment 3
[0043] On the basis of the above-mentioned embodiment, in order to guide the trajectory of the downward movement of the first connecting shaft 43, avoid reducing the impact on the second connecting shaft 44 due to the deviation of the first connecting shaft 43, and reduce the compaction effect, so the first connecting shaft 43 The upper half of the two connecting shafts 44 is a hollow structure, and the lower end of the first connecting shaft 43 is located in the hollow structure of the second connecting shaft 44 and is slidably connected with the inner wall of the hollow structure.