Cable trench drainage device and construction method thereof
A technology for drainage devices and cable trenches, which is applied in the installation of water supply devices, drainage structures, cables, etc., can solve the problem that rainwater cannot be discharged through natural drainage, the adverse effects of normal operation of electrical equipment in booster stations, and the inflow of rainwater and mud on site. and other problems to achieve the effect of reducing concrete consumables, avoiding damage and reducing costs
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0034] The cable trench drainage provided by the present invention, such as Figure 1 - Figure 4 As shown, including the drain pipe 2, the soil platform, and the rainwater well 4, the soil base platform includes a first soil base platform 31 and a second soil platform 32. Among them, the drain pipe 2 is arranged in the upper portion of the trench wall 11 of the cable trench, and the drain pipe 2 is connected to the first soil base platform 31 built in the closed area and the second soil base platform 32 of the open area. The water port is coupled to the surface of the first soil base 31, and the water port is connected to the surface of the second soil platform 32; the height of the wellhead of the rainwater 4 is not higher than the minimum ground height of the open area 7, and at least one, The water entering the open area is unified into the rainwater 4.
[0035] The material of the drain 2 is PVC, but is not limited thereto, the other has high strength, corrosion resistant mater...
Embodiment 2
[0038] The present invention also provides a method of building a cable trench drainage apparatus according to Example 1. The construction method is:
[0039] The drainage pipe 2 is horizontally held above the open cable 1, and the closed area 6 and the open area of the connecting area of the cable trench are connected.
[0040] The drain pipe 2 and the cable groove wall 11 are connected by concrete pouring;
[0041] The first soil base platform 31 is poured at the inlet portion of the damper 6 corresponding to the drain pipe 2, and the second soil base platform 32 is poured in the open area 7, and the water supply tube 2 has the water supply and the first soil. The surface of the base platform 31 is connected, the water port is connected to the surface of the second soil platform 32; the height of the first soil base platform 31 is larger than the surface height of the second soil platform 32, the water supply pipe 2 in the water supply pipe 2 The height is greater than the w...
PUM
Property | Measurement | Unit |
---|---|---|
Diameter | aaaaa | aaaaa |
Wall thickness | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information

- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com