Construction progress calculation method and system based on spraying robot construction

A spraying robot and construction progress technology, applied in the field of spraying, can solve problems such as large data differences, increased observation deviations, and window calculation deviations

Inactive Publication Date: 2021-09-10
筑橙科技(深圳)有限公司
View PDF4 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] Exterior wall spraying construction projects are traditionally based on manual construction, and the construction progress mainly relies on manual on-site observation and evaluation. The on-site observation and evaluation data are quite different, and the deviation comes from three aspects: one is the deviation of the observation itself, and the data observed by the naked eye will itself There is a large deviation; the second is the deviation of the calculation of the windows. When encountering walls with different sizes and a large number of windows, the observation deviation will increase; the third is that the difficulty of each construction process of exterior wall spraying is different. The process sets the workload weight of each process, and the traditional manual construction schedule calculation does not introduce weight calculation

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction progress calculation method and system based on spraying robot construction

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0037] see figure 1 , a construction schedule calculation method based on spraying robot construction, including:

[0038] S1. Obtain the construction operation target;

[0039] The buildings of the engineering project are obtained from the project data, and each building is numbered and entered into the cloud management platform.

[0040] S2. Dividing the construction operation target into multiple operation surfaces;

[0041] According to the characteristics of the external wall construction project, each building is divided according to the working surface. For example, building No. 1 contains several working surfaces, and building No. 2 contains several working surfaces. Binding each working surface to the corresponding building, Generate basic data and enter the basic data into the cloud management platform.

[0042] For example, Building No. 1 has 4 working surfaces, and the numbers of the 4 working surfaces are 0101, 0102, 0103 and 0104 respectively; Building 2 has 6...

Embodiment 2

[0061] The present invention also relates to a construction progress calculation system based on spraying robot construction, including an acquisition module, a segmentation module, a setting module, a distribution module, a binding module and a calculation module,

[0062] The acquiring module is used to acquire construction operation targets and robot construction records;

[0063] The buildings of the engineering project are obtained from the project data, and each building is numbered and entered into the cloud management platform.

[0064] After the cloud management platform obtains the robot construction records, it analyzes the robot construction records, and enters the working surface and construction conditions in the robot construction records into the system. In order to ensure the accuracy of the data, it can also be verified by on-site personnel to confirm which robot construction records are. The construction record of which construction process on the working su...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention provides a construction progress calculation method and system based on spraying robot construction. The method comprises the steps: acquiring a construction operation target and dividing the target into a plurality of working planes; setting working parameters of each working plane; distributing a robot for each working plane; enabling the robot to carry out construction and generate a robot construction record; acquiring the robot construction record; calculating the completion progress of the current working plane; and calculating the construction progress of the current construction operation target. The method has the beneficial effects that: the spraying data of the robot is recorded, the construction record of the robot is uploaded through the Internet, and the construction progress of the project is calculated in real time, so that the accuracy of construction progress calculation and the real-time performance of construction progress calculation are improved; and for project management personnel and company leaders, the construction progress of a project can be obtained in real time, the construction progress of each building and working face can be seen in detail, project progress information can be obtained in real time, and commanding and decision making are facilitated.

Description

technical field [0001] The invention relates to the technical field of spraying, in particular to a method and system for calculating construction progress based on spraying robot construction. Background technique [0002] Exterior wall spraying construction projects are traditionally based on manual construction, and the construction progress mainly relies on manual on-site observation and evaluation. The on-site observation and evaluation data are quite different, and the deviation comes from three aspects: one is the deviation of the observation itself, and the data observed by the naked eye will itself There is a large deviation; the second is the deviation of the calculation of the windows. When encountering walls with different sizes and a large number of windows, the observation deviation will increase; the third is that the difficulty of each construction process of exterior wall spraying is different. The process sets the workload weight of each process, and the tr...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/06
CPCG06Q10/063
Inventor 路可可正端
Owner 筑橙科技(深圳)有限公司