Tunnel secondary lining surface water seepage prevention construction method
A construction method and tunnel technology, which is applied in the direction of tunnel lining, tunnel, shaft lining, etc., can solve the problems of dampness and non-compactness, and achieve the effects of improving water seepage, good flatness, and improving color inconsistency
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0042] refer to figure 1 with figure 2 , the construction method for the prevention and control of water seepage on the surface of the second lining of the tunnel includes the following steps:
[0043] S1: Build a reinforcement frame on the surface of the primary lining of the tunnel, and the reinforcement frame is laid in a circular direction; provide the main keel 1, fix the main keel 1 on the surface of the primary lining, and build longitudinal reinforcement 2 and transverse reinforcement 3 on the main keel 1, to form a steel frame.
[0044] Specifically, refer to image 3 , in this embodiment, the main keel 1 is fixed on the surface of the primary lining through pre-embedded screws, and the main keel 1 is equidistantly provided with a number of positioning grooves 11 along the length direction, and the longitudinal reinforcement 2 is bent according to the contour of the tunnel, and the longitudinal The steel bar 2 is clipped in the positioning groove 11, and the longi...
Embodiment 2
[0057] refer to figure 1 , the construction method for the prevention and control of water seepage on the surface of the second lining of the tunnel includes the following steps:
[0058] S1: Build a reinforcement frame on the surface of the primary lining of the tunnel, and the reinforcement frame is laid in a circular direction; provide the main keel 1, fix the main keel 1 on the surface of the primary lining, and build longitudinal reinforcement 2 and transverse reinforcement 3 on the main keel 1, to form a steel frame.
[0059] Specifically, in this embodiment, the main keel 1 is fixed on the surface of the initial lining by a pre-embedded screw, and the main keel 1 is equidistantly provided with several positioning grooves 11 along the length direction, and the longitudinal reinforcement 2 is bent according to the contour of the tunnel. , the longitudinal steel bar 2 is clamped in the positioning groove 11, and the longitudinal steel bar 2 and the main keel 1 are welded....
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com