The invention relates to the field of
solid waste
resource utilization research, in particular to treatment-free
red mud-based regenerated flow state solidified soil suitable for foundation pit backfill and a construction method thereof, and the treatment-free
red mud-based regenerated flow state solidified soil comprises the following components in parts by
mass: 100 parts of
engineering residue soil, 10-30 parts of
red mud compound regenerated micro
powder, 50-70 parts of regenerated fine aggregate and 5-10 parts of a water-based activator. The red mud compound regenerated micro
powder, the regenerated fine aggregate, the
engineering residue soil and the water-based exciting agent are stirred and mixed uniformly in proportion to obtain the treatment-free red mud-based regenerated fluid-state solidified soil suitable for foundation pit backfilling, the red mud does not need to be dried by adopting the fluid-state solidified soil, the construction method is simple, the feasibility is high, and the construction cost is low. The backfilling compactness and strength of the foundation pit can be effectively guaranteed without rolling, post-construction settlement is reduced, a large number of
solid waste resources such as red mud and
construction waste are utilized, and the good energy-saving and carbon-reducing effects are achieved.