Unlock instant, AI-driven research and patent intelligence for your innovation.

Aerospace heterogeneous earth observation resource collaborative scheduling method for static target observation

A collaborative scheduling and earth observation technology, applied in the field of remote sensing, can solve the insufficient research on the collaborative scheduling technology of space-time heterogeneous earth observation resources, the insufficient research on collaborative scheduling technology of space-space heterogeneous earth observation resources collaborative organization model, etc. problem, to achieve the effect of speeding up the convergence speed and improving the optimization performance

Active Publication Date: 2021-10-08
CENT SOUTH UNIV
View PDF9 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] The research on the coordinated scheduling technology of multi-satellite and multi-UAV has become mature, but in recent years, the research on the coordinated scheduling technology of space heterogeneous earth observation resources is quite insufficient
Judging from the current research, most relevant researchers mainly focus on the information fusion of satellite remote sensing data and UAV remote sensing data. However, the remote sensing data fusion technology of heterogeneous resources has been relatively mature and has been widely used in related fields. , but the research on the collaborative organization mode of space and space heterogeneous earth observation resources for static targets and the corresponding collaborative scheduling technology is not enough

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Aerospace heterogeneous earth observation resource collaborative scheduling method for static target observation
  • Aerospace heterogeneous earth observation resource collaborative scheduling method for static target observation
  • Aerospace heterogeneous earth observation resource collaborative scheduling method for static target observation

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0047] The present invention will be further described below in conjunction with the accompanying drawings, but the present invention is not limited in any way. Any transformation or replacement based on the teaching of the present invention belongs to the protection scope of the present invention.

[0048] The present invention proposes a multi-Agent layered collaborative scheduling framework for static target observation requirements, and combines the simulated annealing algorithm of variable neighborhood structure adjustment to iteratively optimize and solve the static target-oriented aerospace heterogeneous earth observation resource scheduling problem; designs A new neighborhood structure framework, and in order to improve the performance of the algorithm, on the basis of this neighborhood framework, a random selection operator, a probability selection operator and a greedy selection operator are proposed; in order to be able to select the best The optimal neighborhood str...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a static target observation-oriented aerospace heterogeneous earth observation resource collaborative scheduling method, and the method comprises the following steps: in a task allocation stage, formulating a task allocation scheme and allocating the task allocation scheme to each sub-planning center; in the resource scheduling stage, enabling the sub-planning center to formulate an optimal resource observation scheme according to the resource capability and the task demand to plan the allocated task; distributing tasks which are not planned to a virtual sub-planning center, selecting three neighborhood structures by adopting a simulated annealing algorithm based on a dynamic neighborhood structure adjustment algorithm, solving an air-space heterogeneous earth observation resource collaborative scheduling problem, reformulating a resource scheduling scheme by the sub-planning center, and generating a final task distribution scheme and a final resource observation scheme. According to the method, a dynamic neighborhood structure adjustment strategy is introduced, the search direction of the algorithm is changed in time through historical search results, so the algorithm is guided to search in the direction of the optimal solution, the optimization performance of the algorithm is improved, and the convergence speed can be increased.

Description

technical field [0001] The invention belongs to the technical field of remote sensing, and in particular relates to a method for collaborative scheduling of space-time heterogeneous earth observation resources oriented to static target observation. [0002] technical background [0003] With the increase in the number of earth observation satellites, the research on multi-satellite observation network networking technology has received more and more attention, and it is one of the important research directions of multi-satellite cooperative scheduling problem. Compared with the single-satellite scheduling problem, the use of multiple satellites can make full use of the observation capabilities of satellites, but it also increases the complexity of scheduling and brings greater challenges to the satellite scheduling problem. The multi-UAV cooperative scheduling problem is similar to the multi-satellite cooperative scheduling problem. It is also a complex combinatorial optimiza...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/06G06N3/00
CPCG06Q10/0631G06N3/006
Inventor 伍国华廖文昆
Owner CENT SOUTH UNIV