Tunnel constructor risk early warning method
A technology for risk early warning and tunnel construction, applied in prediction, instrument, character and pattern recognition, etc., can solve the problems of reducing the accuracy and efficiency of early warning, and achieve the effect of avoiding low recognition accuracy and improving accuracy and efficiency
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0040] The following will clearly and completely describe the technical solutions in the embodiments of the present application with reference to the drawings in the embodiments of the present application. Obviously, the described embodiments are only some of the embodiments of the present application, not all of them. Based on the embodiments in this application, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of this application.
[0041] The core of the present application is to provide a risk early warning method for tunnel construction personnel to improve the accuracy and efficiency of tunnel construction personnel risk early warning.
[0042] In order to enable those skilled in the art to better understand the solution of the present application, the present application will be further described in detail below in conjunction with the drawings and specific implementation methods.
[00...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


