High-flowability, low-shrinkage and low-glossiness modified PP material and preparation process thereof
A low-gloss, low-shrinkage technology, applied in the low-gloss modified PP material and its preparation process, low-shrinkage, high-flow field, can solve the problems of low gloss, low shrinkage, low rigidity, etc., and achieve dimensional stability High performance, reduced part weight, low shrinkage effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0024] 80 parts of PP material, 10 parts of mineral filler material, 8 parts of toughening agent, 2 parts of matting agent, 0.2 part of lubricant erucamide, 10100.2 parts of antioxidant, 1680.2 parts of antioxidant, 0.3 part of light stabilizer, 1.5 parts of toner .
[0025] The preparation process of Example 1: Weigh the materials in the raw material formula according to the weight ratio, and place the PP material, toughening agent, mineral filler material, matting agent, lubricant, antioxidant, light stabilizer, and toner in proportion. In the stamping machine, the raw material is stamped to obtain the mixture A, and then the mixture A is uniformly stirred for 5-10 minutes, and then the extrusion temperature of the twin-screw extruder is adjusted to 190-210 °C, and the speed of the host equipment is adjusted to 500~700rpm, put the mixture A in the machine to extrude the mixture B, put the mixture B outside, let it cool naturally for 3~4 minutes, put the cooled mixture B on t...
Embodiment 2
[0027] 82 parts of PP material, 10 parts of mineral filling material, 8 parts of toughening agent, 0.2 part of lubricant erucamide, 10100.2 parts of antioxidant, 1680.2 parts of antioxidant, 0.3 part of light stabilizer, and 1.5 parts of toner.
[0028] The preparation process of Example 2: Weigh the materials in the raw material formula according to the weight ratio, place the above-mentioned materials in the punching machine, carry out the punching of the raw materials, obtain the mixture A, and then stir the mixture A uniformly for 5-10 minutes, Then adjust the extrusion temperature of the twin-screw extruder to 190-210°C, adjust the speed of the host equipment to 500-700rpm, place the mixture A in the machine to extrude the mixture B, and place the mixture B outside for natural extruding Cool for 3 to 4 minutes, place the cooled mixture B on a dryer, and dry it for 1 to 2 minutes to dry the internal moisture, and place the dried mixture B on a twin-screw extrusion granulato...
Embodiment 3
[0030] 77 parts of PP material, 10 parts of mineral filling material, 13 parts of toughening agent, 2 parts of matting agent, 0.2 part of lubricant erucamide, 10100.2 parts of antioxidant, 1680.2 parts of antioxidant, 0.3 part of light stabilizer, 1.5 parts of toner .
[0031] The preparation process of Example 3: Weigh the materials in the raw material formula according to the weight ratio, place the above-mentioned materials in the punching machine, carry out the punching of the raw materials, obtain the mixture A, and then stir the mixture A uniformly for 5-10 minutes, Then adjust the extrusion temperature of the twin-screw extruder to 190-210°C, adjust the speed of the host equipment to 500-700rpm, place the mixture A in the machine to extrude the mixture B, and place the mixture B outside for natural extruding Cool for 3 to 4 minutes, place the cooled mixture B on a dryer, and dry it for 1 to 2 minutes to dry the internal moisture, and place the dried mixture B on a twin-...
PUM
| Property | Measurement | Unit |
|---|---|---|
| Melt index | aaaaa | aaaaa |
| Density | aaaaa | aaaaa |
| Izod notched impact strength | aaaaa | aaaaa |