Unlock instant, AI-driven research and patent intelligence for your innovation.

A method for construction progress information feedback and bim model real-time display deviation

A construction progress and information feedback technology, applied in the field of project management, can solve the problems of untimely and inaccurate progress data feedback

Active Publication Date: 2022-01-07
北京天辰信科技有限公司
View PDF7 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

For this reason, the purpose of the present invention is to propose a method for construction progress information feedback and BIM model real-time display of deviations. On the basis of realizing automatic, accurate and comprehensive collection of engineering data, the data are structured and stored, and automatically respond Display on the BIM model to solve the current problem of relying on personnel input or BIM model adjustment, and progress data feedback is not timely and inaccurate

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A method for construction progress information feedback and bim model real-time display deviation
  • A method for construction progress information feedback and bim model real-time display deviation
  • A method for construction progress information feedback and bim model real-time display deviation

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0059] The preferred embodiments of the present invention will be described below in conjunction with the accompanying drawings. It should be understood that the preferred embodiments described here are only used to illustrate and explain the present invention, and are not intended to limit the present invention.

[0060] Such as figure 1 As shown, the embodiment of the present invention proposes a method for construction progress information feedback and BIM model real-time display deviation, including steps S1-S3:

[0061] S1. Obtain engineering project information, create a BIM model according to the engineering project information, and mark the BIM model according to the flow section;

[0062] S2. Obtain construction data, and obtain actual construction progress information according to the construction data;

[0063] S3. Match the actual construction progress information with the BIM model, compare the actual construction progress information in the BIM model after the m...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a method for construction progress information feedback and BIM model real-time display deviation, comprising: obtaining engineering project information, creating a BIM model according to the engineering project information, and marking the BIM model according to the flow section; obtaining Construction data, obtaining actual construction progress information according to the construction data; matching the actual construction progress information with the BIM model, and matching the actual construction progress information in the BIM model with the corresponding preset progress The data are compared, and according to the comparison results, the engineering tasks whose progress is delayed are determined, and different warning colors are marked on the BIM model. On the basis of realizing the automatic, accurate and comprehensive collection of engineering data, the data will be stored in a structured manner, and automatically reflected on the BIM model for display, so as to solve the current problem of relying on personnel input or BIM model adjustment, and the progress data feedback is not timely , Inaccurate problem.

Description

technical field [0001] The invention relates to the technical field of engineering management, in particular to a method for feedbacking construction progress information and displaying deviations in real time on a BIM model. Background technique [0002] With the rapid development of big data, intelligence, cloud computing, and Internet technology, and the urgent need for informatization transformation in the construction industry, more and more attention has been paid to the refined management of engineering projects and the need for remote supervision. However, the current engineering project management method is still relatively traditional, and the data in the engineering construction process has not been fully collected and effectively utilized. For the data in the construction process, the method of manual recording and manual statistics and summary is still adopted, the work efficiency is not high, and the data utilization rate is low. [0003] As a key control link...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): G06F30/13G06F30/20G06F16/26
CPCG06F30/13G06F30/20G06F16/26
Inventor 贾正芒
Owner 北京天辰信科技有限公司