Flexible job shop scheduling method for solving transportation time and adjustment time
A technology for adjusting time and flexible operation, applied in the direction of instruments, manufacturing computing systems, data processing applications, etc., can solve the problems of non-unique processing machines, inconsistencies, and differences in processing time, and achieve the effect of rapid optimization
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0028] In order to make the object, technical solution and advantages of the present invention clearer, the following in conjunction with the attached Figure 1-9 , the specific embodiment of the present invention will be described in further detail.
[0029] Step 1: Parameter setting, setting the hybrid multi-objective group intelligent algorithm to solve the relevant parameters of FJSP with transportation time and adjustment time, including: group size N pop , number of iterations N iter , mutation probability P mutr , the maximum number of iterations of ant colony N ACO-iter , the number of ants N ant , initial pheromone concentration C init , pheromone factor weight W pe , heuristic function weight W he , Evaporation rate P rho .
[0030] The termination condition of the hybrid multi-objective group intelligent algorithm is: the number of operation cycles reaches the number of iterations N iter stop.
[0031] Explanation on parameter values:
[0032] Group size ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


