Ultrahigh tower construction progress management system and method based on BIM technology

A construction progress and management system technology, applied in data processing applications, special data processing applications, instruments, etc., can solve the problems of poor timeliness of construction information update, poor information on the construction site and progress management terminal, and low progress visualization degree. Improve completion efficiency, reduce information difference, and achieve good visualization effects

Pending Publication Date: 2021-11-19
国网江苏省电力有限公司建设分公司
View PDF0 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, in the current construction project schedule management process, there are still problems such as poor timeliness of construction information updat

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Ultrahigh tower construction progress management system and method based on BIM technology
  • Ultrahigh tower construction progress management system and method based on BIM technology
  • Ultrahigh tower construction progress management system and method based on BIM technology

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0039] Below in conjunction with the appendix of the present invention Figure 1~4 , clearly and completely describe the technical solutions in the embodiments of the present invention, obviously, the described embodiments are only some of the embodiments of the present invention, not all of them. Based on the embodiments of the present invention, all other implementations can be obtained by those skilled in the art without making creative efforts.

[0040] In the description of the present invention, it should be understood that the terms "counterclockwise", "clockwise", "longitudinal", "transverse", "upper", "lower", "front", "rear", "left", The orientation or positional relationship indicated by "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", etc. is based on the orientation or positional relationship shown in the drawings, and is only for the purpose of It is convenient to describe the present invention, but does not indicate or imply that the device...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses an ultrahigh tower construction progress management system and method based on a BIM technology, and relates to the field of building construction management. According to the invention, progress management planning performance in a construction project is high, a BIM model is adopted, and traditional paper files and complex data records are abandoned, so that engineering progress is more intuitive and concise in performance; different color representations are set for different construction teams, so that the visualization effect is good, and the distinguishing performance is high; a monitoring module is further arranged, so that remote monitoring can be conveniently carried out by a progress management party, the situation of wrong report and false report of the construction teams can be found in time, and information gaps are reduced; for ultrahigh tower type buildings, smooth implementation of early-stage installation work of frameworks, formworks and the like can be effectively guaranteed, and the concrete foundation pouring efficiency is improved; and the material consumption amount of the construction project can be pre-judged, engineering material preparation is made for the construction teams in advance, and the completion efficiency of the construction project is further improved.

Description

technical field [0001] The present invention relates to the field of building construction management, in particular to a BIM technology-based super-high tower construction progress management system and method Background technique [0002] In the modern rail transit construction project management system, progress control, as one of the three major objectives of project control, is directly related to the overall benefit of the project and is also a means to ensure the success of the project. There is a relationship of unity of opposites among schedule control, cost control and quality control. An effective schedule control method should take into account the multi-objective coordination of project management, which is helpful to realize the control of the overall project goal. However, schedule delays often occur in the actual construction process of the project, and traditional schedule control methods cannot achieve coordinated control of schedule, cost, and quality. T...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): G06Q10/10G06Q50/08G06F30/13
CPCG06Q10/103G06Q50/08G06F30/13
Inventor 裴爱根张洋谷开新朱姣王璐瑶林直晓杨毅王巍伟王一飞
Owner 国网江苏省电力有限公司建设分公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products