Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

40 results about "Management planning" patented technology

Autonomous operation intelligent road roller system

The invention discloses an autonomous operation intelligent road roller system comprising a road roller body, a machine control layer for controlling the motion of the road roller body, a perceive decision layer and a management planning layer; a carrier phase differential technology GNSS is adopted to realize high-precision positioning and course measurement; the vehicle body is provided with a millimeter wave radar for detecting obstacles in the periphery of the vehicle body; the vehicle body is provided with a laser radar and a camera used for high-precision map construction and side slopedetection of a rolling area, so that a management planning end can carry out rolling operation planning; an onboard compaction degree online detection technology is adopted to realize full-coverage online detection of the compaction degree, and a basis is provided for frequency modulation amplitude modulation; an expert system and a big data system are internally arranged in the management planning end, rolling planning can be autonomously performed according to the characteristics of the construction site compacted material, the parameters of the road roller, the compaction degree informationand the high-precision map, and cluster compaction data sharing and collaborative operation is realized; the vibration energy output can be adjusted in real time by the road roller according to the compaction progress, and the compaction quality and efficiency are effectively improved.
Owner:CHANGAN UNIV

Management planning and scheduling execution system for production manufacturing site

The invention discloses a management planning and scheduling execution system for a production manufacturing site, and the system mainly comprises a feeding scheduling module, a quality tracing module and an OEE monitoring and analysis module. The feeding scheduling module is the foundation of the whole system, and the quality tracing module and the OEE monitoring and analysis module achieves the monitoring and management of the whole feeding scheduling process. After a user starts a feeding process, the quality tracing module monitors the quality of materials in the whole feeding process, and tracks the source of the unqualified materials in the first time. The OEE monitoring and analysis module carries out the statistics of various types of losses and time wastes generated in the whole feeding process, and obtains the efficiency data of equipment, thereby improving the utilization rate of the equipment through data analysis. The system provides a quick-response flexible and fine manufacturing environment for a user, helps an enterprise reduce the cost, deliver the goods on schedule and improve the product quality and the service quality, can be suitable for different industries, and is wide in application range.
Owner:SICHUAN AEROSPACE SYST ENG INST

Production equipment management planning system based on big data

ActiveCN111045410ASolve the problem that the time required for part replacement cannot be clearly obtainedImprove the protective effectTotal factory controlProgramme total factory controlManagement planningAcquisition apparatus
The invention discloses a production equipment management planning system based on big data. The system comprises an acquisition module, an arrangement module, an analysis module, a database, a calculation module, an adjustment module, a planning module and a display screen, wherein the acquisition module is used for acquiring equipment data information which comprises equipment maximum temperature data, equipment working time length data and equipment use frequency data and transmitting the data to the arrangement module; and the arrangement module arranges the equipment maximum temperature data, the equipment working time length data and the equipment use frequency data and then transmits the data to the analysis module. According to the invention, the acquired equipment data informationis subjected to daily working state analysis through the analysis module to obtain the damage of different working states to the equipment, and the damage coefficient is accurately analyzed to generate an adjusting signal, so that the protection to the equipment is enhanced, the service life of the equipment is prolonged, and the economic loss of people is reduced.
Owner:JIESHOU XUNLIDA ELEVATOR CO LTD

Road event detection system

The invention relates to the field of traffic safety management, in particular to a road event detection system. front-end systems acquire information of road traffic events and traffic parameters onroads in real time and transmits the information to a central system, according to the road information uploaded by each front-end system, a processing host conductscomprehensive analysis and processing of the traffic events and the traffic parameters of an entire road network, and operation clients display the road event information and the corresponding traffic parameters in real time to facilitate understanding real-time road conditions of the corresponding roads; and in case of traffic events, an application server generates alarm information and processing plans and displays the alarm information and the processing plans in the operation clients to facilitate making response measures timely, impact on the road traffic function is reduced, the operation clients can access the alarm information, the traffic events and the traffic parameters stored in a database server, and a reference for road safety management planning is provided conveniently.
Owner:南京奥杰智能科技有限公司

10kV power distribution network low voltage automatic management planning and assessment method

The invention provides a 10kV power distribution network low voltage automatic management planning and assessment method. The 10kV power distribution network low voltage automatic management planning and assessment method includes a one-key type automatic planning for 10kV power distribution network low voltage management, multiple-step type guiding planning of 10kV power distribution network low voltage management, and comprehensive assessment of a 10kV power distribution network low voltage management scheme. The 10kV power distribution network low voltage automatic management planning and assessment method is a set of low voltage management process, and can realize the one-key type automatic management planning scheme through software. The 10kV power distribution network low voltage automatic management planning and assessment method also designs the guiding type multiple-step planning, selects one of three management measures through guiding of software: exchanging of wires, reactive compensation and configuration of a voltage regulator, only performs single step of management for each selection, and can perform automatic planning on the basis of single step reconstruction. The comprehensive assessment method of 10kV power distribution network low voltage management designs a three dimensional assessment system, can obtain the index weight by reconstructing an auxiliary judgment matrix and an auxiliary sum matrix, and finally can realize the calculating process of assessment.
Owner:STATE GRID JIANGXI ELECTRIC POWER CO LTD RES INST +1

Marine space development suitability evaluation method

PendingCN111582686AGuarantee the bottom line of ecological securityObjective reflectionResourcesManagement planningEnvironmental resource management
The invention relates to a marine space development suitability evaluation method. The method comprises the following steps of 1, determining evaluation content; 2, evaluation index screening; 3, establishing an evaluation unit; 4, evaluating a single index; 5, performing comprehensive integration evaluation; and 6, comprehensively analyzing by using sea. The method is scientific and reasonable indesign, and has the main advantages and effects that firstly, an extremely important and extremely sensitive area of ecology is deducted preferentially, and ecological priority protection is guaranteed; secondly, the index system starts from resource environment background conditions, objectively reflects a resource environment basis on which ocean development and utilization depend, strengthensenvironmental protection base lines such as ocean environmental pollution and the like, and provides a sufficient scientific basis for future management planning; and thirdly, during integrated evaluation, an analytic hierarchy process, an expert discrimination method and other integrated methods are not adopted, but a relatively simple matrix logic discrimination method is adopted, so that the method is clearer and more visual, the influence of artificial supervisor prejudice is avoided, and the method has universality and universality.
Owner:NAT MARINE DATA & INFORMATION SERVICE

Interactive Marketing Simulation System and Method

InactiveUS20150227878A1Measurable business performance improvementImprove efficiencyDesign optimisation/simulationResourcesManagement planningProgram planning
An interactive web-based marketing simulation game relying on a proprietary body of knowledge (BoK), techniques and methods allows marketing business leaders to simulate the likely outcomes arising from strategic choices made by the user or by management. A tool enabling modification to create evidence-based, objectively validated modified user data to increase the confidence in the predictability of the outcomes arising from strategic choices enables anonymous conversations between users through comments, questions and feedback. The result is a management planning and decision support tool capable of suggesting to the user that the user activate certain specific initiatives in a specific order to achieve desired outcomes within a desired timeframe.
Owner:ACXIOM LLC

HMI-based three dimensional visualization service engine and operation method thereof

InactiveCN106201154AHuman service modelConvenient service modeInput/output processes for data processing3D modellingManagement planningBusiness data
A diversified one-stop service HMI-based three dimensional visualization service engine and an operation method thereof are provided; the HMI-based three dimensional visualization service engine comprises the following elements: a cloud data interface module used for inputting, screening, parsing and integrating data; a service engine core module connected with the cloud data interface module and used for loading business data and customizing the business data in a memory; a business navigation module connected with the service engine core module and used for invoking business information needed by a user managing business; a management planning module connected with the service engine core module and used for invoking user working site time and geography information. The diversified intelligent service terminals and cloud data services are combined, and a friendly guiding mode is employed, thus reasonably integrating business navigation, an electronic map, position services, management planning, route planning, and a three dimensional panorama technology module, and providing the one-stop service effect.
Owner:江苏易图地理信息科技有限公司

Method of optimizing variation function parameter fitting of forest resource management

The invention discloses a method of optimizing variation function parameter fitting of forest resource management. The method comprises steps that a satellite is used to acquire remote sensing image data of forest resources, and a computer terminal is used for data statistics and quantitative processing of sampling areas; data particle swarm optimization is carried out, and by adopting a K-mean partitioning method, partitioning clustering of variable parameter sets is carried out, and then the fitting of the variable parameters is carried out; by adopting a support vector regression method, the optimization of the variation function parameter fitting of the multidimensional eigenvectors of the sampling areas is carried out. The method is advantageous in that by aiming at various multi-temporal multi-source remote sensing data having different resolutions and multiple space scales of domestic and oversea satellite systems, requirements of forestry department of various stages on forest resource management informatization are better satisfied after the above mentioned optimization, and an object of enhancing the forest resource management is achieved, and at the same time, the timely updating and the phased management planning of the forest resource data are realized.
Owner:XINJIANG AGRI UNIV +1

Spaceflight control system product inventory intelligent management system

InactiveCN110991949ASolve the problem of large amount of management work dataFree laborLogisticsManagement planningSpaceflight
The invention discloses a spaceflight control system product inventory intelligent management system. The system comprises a product warehousing management planning module and an intelligent storage module. The product warehousing management planning module comprises a product automatic identification system and a storage space planning system. The product automatic identification system comprisesa product information acquisition device, a product database and a bar code generator. The product information acquisition device is used for acquiring a product appearance image and a nameplate, matching with a standard template in a product library, generating unique product codes, the storage space planning system sets different weights according to the product information, the size, the weight and the use frequency information through a space planning algorithm, an optimal storage scheme is designed according to the remaining inventory capacity in the current container, and the intelligent storage module is composed of a product access execution system, a flexible intelligent three-dimensional container and an inventory data management system.
Owner:BEIJING AEROSPACE AUTOMATIC CONTROL RES INST

Distribution network transformation and construction analyzing and planning system

The invention provides a distribution network transformation and construction analyzing and planning system, which comprises a stage control subsystem, a mode control subsystem, a method control subsystem and a technology control subsystem. The distribution network transformation and construction analyzing and planning system dynamically controls the stage of management planning through the stage control subsystem, controls the transformation and construction mode through the mode control subsystem controls the specific procedures of the planning through the method control subsystem, and select the appropriate technical model in the planning through the technology control subsystem to form a closed-loop whole-process planning management. By the distribution network transformation and construction analyzing and planning system, the planning of design of the distribution network is led and proceeded in order. Urban and rural overall development and supply are guaranteed. The system is unified in standard, safe, economic, intelligent, environment-friendly, upgraded, and innovative.
Owner:YUNNAN POWER GRID +1

Topology and arrangement system and method of cloud application, storage medium and electronic equipment

The invention provides a topology and arrangement system and method of a cloud application, a storage medium and electronic equipment. The topology and arrangement system of the cloud application comprises a template management module which is used for managing each node template; a topology construction module which is used for establishing a relationship among the target node templates and outputting a preliminary arrangement package of the cloud application; a plan construction module which is used for generating a management plan of the cloud application according to the preliminary arrangement package; an arrangement output module which is used for importing the management plan into the initial arrangement package to generate a final arrangement package of the cloud application; a man-machine interaction module which is used for providing a visual interface for the template management module and the topology construction module; and a template selection module which is used for acquiring a user input instruction, selecting the target node templates from the template management module according to the user input instruction, and determining the relationship among the target node templates according to the topology construction module. Through the technical scheme of the invention, the user can easily establish and manage the cloud application without mastering professional modeling knowledge.
Owner:SHANGHAI ENG RES CENT FOR BROADBAND TECH & APPL +1

Cyclic progressive health management method suitable for chronic disease and high-risk patients

The invention relates to a cyclic progressive health management system suitable for chronic disease and high-risk patients. The cyclic progressive health management system is characterized by comprising a file establishment module, a screening and grading module, a management planning module, a self-management module, a follow-up evaluation module and a plan updating module, wherein the file establishment module, the screening and grading module, the management planning module, the self-management module, the follow-up evaluation module and the plan updating module are sequentially connected from end to end to form a closed-loop link structure, health and disease management for patients with chronic diseases and high-risk diseases are integrated, and health management tasks such as effective file establishment, screening, grading and classification, intervention, evaluation and early-warning for the patients with chronic diseases and high-risk diseases are effectively realized throughfile establishment, screening and grading, management planning, self-management, follow-up evaluation and plan updating.
Owner:南京旭颢信息科技有限公司

Cyclic progressive health management system for chronic and high-risk disease patients

The invention relates to a cyclic progressive health management system for chronic and high-risk disease patients. The system is characterized by comprising an archive establishment module, a screening grading module, a management planning module, a self-management module, a follow-up evaluation module and a plan update module, wherein the archive establishment module, the screening grading module, the management planning module, the self-management module, the follow-up evaluation module and the plan update module are sequentially connected end to end to form the cyclic enclosed chain ring structure, health disease management of the patients with chronic and high-risk diseases is integrated, through archive establishment, screening, grading, management planning, self-management, follow-upevaluation and plan update, health management works such as effective documentation, screening, grading, classification, intervention, evaluation, early warning, etc. for the patients with chronic and high-risk diseases are effectively achieved.
Owner:南京旭颢信息科技有限公司

Managing plan problems across planning cycles

A method for managing plan problems across planning cycles includes accessing a first plan generated in a first planning session of a first planning cycle, identifying one or more first plan problems reflected in the first plan, and storing and persisting plan problem data associated with the one or more first plan problems for access in one or more successive planning cycles. The method includes accessing a second plan generated in a second planning session of a second planning cycle subsequent to the first planning cycle, identifying one or more second plan problems reflected in the second plan, and comparing the one or more first plan problems identified for the first planning cycle with the one or more second plan problems identified for the second planning cycle. The method includes determining, for each second plan problem identified for the second planning cycle, whether the second plan problem corresponds to any first plan problem identified for the first planning cycle. The method includes updating the plan problem data for the corresponding first plan problem to reflect the identification of the second plan problem for the second planning cycle if a second plan problem identified for the second planning cycle corresponds to a first plan problem identified for the first planning cycle. The method includes storing and persisting plan problem data associated with the new plan problem for access in one or more successive planning cycles if a second plan problem identified for the second planning cycle is a new plan problem not corresponding to a first plan problem identified for the first planning cycle.
Owner:BLUE YONDER GRP INC

A method and a system for determining project management planning

The present application relates to a method and a system for determining project management planning, wherein the method includes determining a principal event involved in a target project, and determining a location of the principal event in the management planning of the target project according to a precondition and subsequent work of the principal event determining each influencing factor of the subject event and sorting the influencing factors according to time; correlating the sequenced influencing factors to the subject events to form a plan of the target project arranged according to acausal relationship and a temporal logic relationship. The technical scheme provided by the application can synchronously plan and manage the time logic of the event while the cause analysis is carried out.
Owner:北京天辰信科技有限公司

IT equipment operation and maintenance management system and method

The invention discloses an IT equipment operation and maintenance management system and method. The IT equipment operation and maintenance management system comprises a task management module, a problem management module, a knowledge management module, an asset management module, a statistics and analysis module and a system management module. The task management module is used for equipment technical state management, planned task, temporary task and equipment maintenance account management; the knowledge management module is used for knowledge collection, knowledge query and knowledge updating; the asset management module is used for asset account management, printing bar code functions, inventory functions, configuration management, change management, asset allocation, asset rejection and assets disposal; and the statistics and analysis module is used for query statistics and performance assessment. The IT equipment maintenance system has the advantages that the IT equipment can beprotected by the system according to preset settings, the IT equipment maintenance speed is high, the working efficiency is high, solutions in the knowledge base can be searched when the IT equipmentis maintained, and the blindness of IT equipment maintenance is reduced.
Owner:广州厉行科技有限公司

High-temperature superconducting material-based full-lifetime evaluation method of offshore wind turbine

The invention discloses a high-temperature superconducting material-based full-lifetime evaluation method of an offshore wind turbine. The method comprises the steps of determining a full-lifetime evaluation period; limiting boundary conditions; determining asset allocation; setting offshore wind turbine parameters; building an evaluation index library; carrying out evaluation index sensitivity and uncertainty analysis; and determining comprehensive evaluation. The used high-temperature superconducting material is the second generation of high-temperature superconducting material; and a superconducting layer is manufactured by a thin-film vacuum deposition technology and comprises six layers in all, namely a copper bottom layer, a hastelloy alloy C276 layer, a yttrium barium copper oxide layer, a nano layer, a silver layer and a 20micron copper top layer separately. By the method, the key index of affecting the full-lifetime of the offshore wind turbine can be determined; management planning decision is facilitated; and equipment is in a good environment-friendly working state, so that the target of the minimum full-lifetime energy consumption is achieved.
Owner:HENAN POLYTECHNIC UNIV

A method and system for the implementation and experience transformation of planning and test management

InactiveCN102289746AReduce difficultyAvoid operational burdenInstrumentsManagement planningDrop tests
The invention discloses a method and system for the implementation and experience transformation of planning and test management, which is suitable for the comprehensive management system of office automation, including client, network server, database, SOA adapter, subsystem and external business system, client and The network server is connected, the network server is respectively connected with the database, the SOA adapter and the subsystem, and the SOA adapter is connected with the external business system. Adopting the technical scheme of the present invention solves the difficulty of information data integration, cumbersome process control, and integration problems brought about by the comprehensive management of the planning, implementation, and assessment of the entire process of transaction processing and the realization of its experience transformation in the comprehensive management system of office automation. The problems of long development cycle, high cost, and difficulty in design and maintenance caused by the complexity of the system reduce the risk of project implementation failure and fill the gap in the field of office automation for the comprehensive and effective management of the entire process of transaction planning, implementation, and assessment. blank.
Owner:夏春秋

Ultrahigh tower construction progress management system and method based on BIM technology

The invention discloses an ultrahigh tower construction progress management system and method based on a BIM technology, and relates to the field of building construction management. According to the invention, progress management planning performance in a construction project is high, a BIM model is adopted, and traditional paper files and complex data records are abandoned, so that engineering progress is more intuitive and concise in performance; different color representations are set for different construction teams, so that the visualization effect is good, and the distinguishing performance is high; a monitoring module is further arranged, so that remote monitoring can be conveniently carried out by a progress management party, the situation of wrong report and false report of the construction teams can be found in time, and information gaps are reduced; for ultrahigh tower type buildings, smooth implementation of early-stage installation work of frameworks, formworks and the like can be effectively guaranteed, and the concrete foundation pouring efficiency is improved; and the material consumption amount of the construction project can be pre-judged, engineering material preparation is made for the construction teams in advance, and the completion efficiency of the construction project is further improved.
Owner:国网江苏省电力有限公司建设分公司

IT equipment allocation management and control system and allocation method thereof

The invention discloses an IT equipment allocation management and control system and an allocation method thereof. The IT equipment allocation management and control system comprises a task managementmodule, a problem management module, a knowledge management module, an asset management module, a statistics and analysis module and a system management module; the task management module is used fortechnical state management, planned task, temporary task and equipment maintenance ledger management of the equipment; the knowledge management module is used for knowledge collection, knowledge query and knowledge updating; the asset management module is used for asset standing book management, a bar code printing function, a checking function, configuration management, change management, assetallocation, asset scrapping and asset disposal; and the statistics and analysis module is used for query statistics and performance assessment. The IT equipment allocation management and control system has the advantages that the IT equipment can be protected by the system according to preset settings, the IT equipment maintenance speed is high, the working efficiency is high, solutions in the knowledge base can be searched when the IT equipment is maintained, and the blindness of IT equipment maintenance is reduced.
Owner:广东鹄志人才服务有限公司

Scientific data management plan generation method and device

The invention discloses a scientific data management plan generation method and apparatus. The method comprises the steps of obtaining demand information of a scientific data management plan; obtaining a plan template of a scene corresponding to the demand information through a pre-constructed semantic knowledge model; if a confirmation instruction for the planning template is received, generatinga data item of the planning module; processing the plan template according to the obtained feedback knowledge matched with the data item to obtain a target plan template; if a deletion instruction for the planning module is received, obtaining a target planning module, wherein the target planning template comprises a planning template obtained through the semantic knowledge model or a received user-defined planning template; and generating a scientific data management plan according to the target plan template to realize management of the scientific data. Based on the semantic knowledge modeland the template library, template selection and self-definition are realized, the data management efficiency is improved, and an effective and personalized scientific data management plan is established.
Owner:中国医学科学院医学信息研究所

Production safety assessment management method and system for manufacturing industry production line

The invention relates to a production safety assessment management method for a manufacturing industry production line, and the method comprises the steps: disassembling the production line into a plurality of processes, and carrying out the analysis of the disassembled production processes; collecting data; performing multi-dimensional safety assessment on the procedures respectively; and making and dynamically adjusting a production line management plan. According to the method, the production stability of the production process is evaluated, so that the dimensionality of production safety risk assessment is increased; according to the method, the safety characteristic data are extracted firstly, then the safety characteristic data of various types are evaluated, and finally the safety risk evaluation is performed on the process in combination with the production stability and the safety characteristic data of various types, so that the safety risk evaluation accuracy is improved; according to the technical scheme of the invention, the disassembly evaluation and respective management of the working procedures are carried out, and the safety management plan is adjusted in a targeted manner according to the safety risk assessment result of each working procedure, so that the diversity of each working procedure is met, and the adaptability to various production working procedures is improved.
Owner:张林林

List and Gantt chart bidirectional influence method

PendingCN112766920ASolve the problem of needing to switch back and forth between different view pages for related operationsSolve the problem of switching back and forth between different view pages for related operationsDatabase updatingRelational databasesManagement planningGantt chart
The invention discloses a list and Gantt chart bidirectional influence method, wherein the list and the Gantt chart are both used for representing management planning of the same task; the information of the task is stored in a database; the method comprises the following steps: establishing a relation between the list and the database and a relation between the Gantt chart and the information of the task in the database, so that the user can know the information of the task through the observation list and / or the Gantt chart; and receiving a first task data modification instruction from the page where the Gantt chart is located, processing the first task data modification instruction, and correspondingly updating the information of the task in the database. A problem that when project management software is used, a user needs to switch various different view pages back and forth for related operation is solved; meanwhile, the operation cost for project management personnel to create and sort task relationships is reduced, the problem that task decomposition hierarchical relationships are disordered is solved, and project management work becomes simple and clear due to high visualization.
Owner:河南省城乡规划设计研究总院股份有限公司

Data access integration method and computer equipment for field of data processing

The invention discloses a data access integration method and computer equipment for the field of data processing, and the method specifically comprises the steps of analyzing a system engineering model, and extracting a product level and the parameter information of each product; forming the task management plan that is used for configuring meta-models of all product parameters under all product levels by stages, generating a storage table structure associated with the task management plan and constructing a unified data space; and capturing product parameters generated by system engineering activities, accessing the data space, and storing the product parameters in a corresponding storage table.
Owner:BEIJING SIMULATION CENT

Intelligent port scheduling system

The invention provides an intelligent port scheduling system, and relates to the technical field of port scheduling. The system comprises: an operation and maintenance platform, a decision-making function system, and a management planning system, wherein the decision-making function system and the management planning system are both based on the operation and maintenance platform, the operation and maintenance platform comprises a function module, a communication module, and a man-machine interaction system, and the decision-making function system comprises a parking space distribution module, an operation line planning module, and a transport vehicle mark number assignment module. According to the system, a receiving part is used for contacting a ship before the ship arrives at a shore to obtain a code of the ship, a to-be-unloaded cargo quantity, and a time point; a planning part is used for determining the berth prolonging time of the ship, and a berth is allocated according to traffic convenience; the operation line planning module is utilized to form the operation line, the operation line serves as an assignment instruction to be sent to an operator of each transportation device, manual data acquisition and automatic acquisition are not needed in the whole process, a scheme is formulated according to set principles, and the operators only need to determine the scheme, so that the efficiency is higher.
Owner:广州智湾科技有限公司

Family wealth information management control system and method, medium and computer equipment

The invention belongs to the technical field of intelligent management, and discloses a family wealth information management control system and method, a medium and computer equipment, and the system comprises an information management module which is used for achieving the intelligentization and systematization of wealth management and is used as a tool box; the system information management module is used for realizing family financial management planning and family customer contract file management; and the management data center module is used for realizing management of financial market data, wealth management data, macroeconomic data, industrial economic data, global tax saving, family governance, global education data and high-end life data. According to the invention, a personalized property management scheme can be provided for the user in a targeted manner based on family and asset conditions of the user, assets, debts and mobility of the customer are managed, and the user is helped to achieve the purposes of reducing risks and realizing wealth appreciation. Meanwhile, based on the intelligent technology, objectiveness and safety are guaranteed, and meanwhile the labor cost is reduced.
Owner:深圳市前海链科信息技术有限公司

Power industry operation and maintenance scheduling system capability management method

The invention discloses a power industry operation and maintenance scheduling system capability management method comprising the steps: endowing different affair processing authorities according to identities of capability management personnel after the corresponding IDs of the capability management personnel are online; pushing a corresponding capability demand management window according to theaffair processing authorities, displaying a capability basic demand list in a list form, and allowing the capability management personnel to operate; carrying out capability demand analysis on the confirmed capability basic demand list; and pushing a reformulated capability management plan to an approval decision-making module of the previous level for approval, and returning to redo if the approval is not passed. Aiming at operation and maintenance scheduling system capability management, multiple steps are adopted for approval and reviewing, and different links are selected for processing according to attribute data of capability requirements, so that high-efficiency management of the scheduling system capability is realized, various requirements are considered, and the operation and maintenance efficiency can be improved.
Owner:CHINA SOUTHERN POWER GRID DIGITAL GRID RES INST CO LTD +1

Green ecological three-dimensional architecture cemetery

InactiveCN105909042ASmall footprintFuneral volume rate is highBurial vaultsMonumentsManagement planningGrating
The invention discloses a green ecological three-dimensional architecture cemetery. The three-dimensional architecture cemetery is of a steel structure frame-type structure or reinforced concrete structure with at least two layers. The three-dimensional cemetery comprises a stairlift arranged in the cemetery architecture, multiple burial areas arranged on each layer, and corridors leading to each burial area. A wall cabinet grating cinerary casket storage area, an individual burial area, a joint burial area, a luxury burial area and a family burial area are arranged on each burial area. The green ecological three-dimensional architecture cemetery is managed and operated in the energy conservation, ecology, voice and network way. The three-dimensional cemetery area with the relatively complete management planning is arranged, the occupied space is small, the burial plot ratio is high, and the management is extremely convenient; the nine-layer (taking nine layers as an example) architecture adopts a "cloud nine" type architectural style, which caters to the Chinese tradition culture and the land use area is greatly reduced; the three-dimensional cemetery is made of waterproof and fireproof materials, safety facilities are complete, management is extremely convenient, and network tomb-sweeping is convenient.
Owner:肖剑

Water-saving management system

The invention provides a water-saving management system, and the system is characterized in that the system comprises a control center, a client, a data acquisition module and a data management module; the control center is in data connection with the client, the data acquisition module and the data management module; through the scheme of the invention, a reference can be provided for evaluating the water-saving management effect, and a basis is provided for water-saving management planning.
Owner:深圳市协润科技有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products