24 results about "Management planning" patented technology

Agricultural product production process intelligent supervision system and method based on big data analysis

InactiveCN120146604AForecastingManagement planningEnvironmental resource management
The invention provides an agricultural product production process intelligent supervision system and method based on big data analysis. The system comprises a data acquisition assembly, a data analysis assembly and a management planning assembly. The method comprises the following steps: deploying various sensors in a field for automatically collecting target data, and uploading the target data to a data analysis component in real time; analyzing the target data by using the collected target data through an agricultural product production data analysis algorithm to obtain the change trend of the soil nutrient content, and predicting when to apply fertilizer and the amount of the fertilizer; meanwhile, pest and disease damage is predicted, and a corresponding prevention and control scheme is provided; suggestions are provided for irrigation according to historical data and current environmental conditions; the analysis result is applied to an agricultural product planting area; the agricultural product planting area plans the planting layout of agricultural products by means of satellite remote sensing and a geographic information system. The agricultural production efficiency and economic benefits are improved, and powerful technical support is provided for agricultural sustainable development.
Owner:BORUI HENGCHUANG (YANCHENG) TECHNOLOGY CO LTD

Park zero-carbon detection management planning method

PendingCN120298003ACommerceManagement planningProcess engineering
The invention discloses a park zero carbon detection management planning method, which belongs to the technical field of carbon emission management and comprises the steps of park data implementation and acquisition, park total carbon emission analysis, carbon reduction measure formulation and implementation, carbon reduction measure adjustment and equipment maintenance, park carbon reduction measure evaluation, park carbon reduction efficiency scoring and the like. The real-time data acquisition unit covers key information of carbon emission, carbon reduction equipment use cost, renewable energy quantity and abnormal carbon emission condition processing duration, direct and indirect carbon emission source emission data are acquired, the carbon emission intensity of each source is calculated, and accurate total carbon emission analysis is realized; a constraint and scoring mechanism for the implementation effect of the carbon reduction measures is provided, whether the carbon reduction measures meet requirements can be accurately judged according to preset parameters, the optimal carbon reduction strategy is selected, and the efficiency and effect of carbon reduction measure selection are remarkably improved; by continuously optimizing and adjusting carbon reduction measures and regularly maintaining related equipment, the overall energy efficiency of the park is improved, and carbon emission is reduced.
Owner:JIANGSU INST OF URBAN PLANNING & DESIGN

Road maintenance and management planning support system

InactiveUS20250182065A1ForecastingManagement planningSupporting system
A road to be repaired is divided into a plurality of segments, for each segment, the priority obtained based on the specification information and according to the road standard of the road to be repaired, the priority obtained by taking into account a number of segments of same repair type in predetermined area, and the priority obtained by taking into account a number of points requiring repair of the same type in the same route are multiplied by the post-repair condition score of the segment to calculate the post-repair weighted condition score. A discrete variables maximizing total sum of values of each segment is calculated, wherein the values of each segment obtained by adding value obtained by multiplying the discrete variable taking either 1 or 0 by the post-repair weighted condition score and value obtained by multiplying difference of 1 and the discrete variable by the condition score. Then, on the basis of the discrete variables, it is determined whether or not repair is necessary for each segment.
Owner:CENT NIPPON EXPRESSWAY CO LTD

Tourism industry management planning method for climate health

ActiveCN121169047AData processing applicationsICT adaptationManagement planningData science
The invention discloses a tourism industry management planning method for climate health, and belongs to the technical field of tourism management, and the method specifically comprises the steps: collecting a climate data set and a tourist health portrait set of a target tourism region; calculating a day-by-day climate comfort level in the planning period according to the climate data set; inputting the climate comfort level sequence and the tourist health portrait set into a climate health matching model, and generating a daily suitability score of each tourist health portrait; planning a health care activity sequence and a space moving path for each tourist health portrait based on the suitability scoring sequence; summarizing planning data of all tourist health portraits, and generating overall tourist distribution prediction and infrastructure load expectation; and according to the prediction result, adjusting the arrangement density of the health care activity sequence and the guiding strategy of the space moving path, and forming a final planning scheme. The invention provides a scientific and systematic planning management method for the climate health tourism industry.
Owner:MINJIANG UNIVERSITY +1

Water management planning system and water management planning method

To draft a water operation plan which realizes a water level response desired by a user.SOLUTION: The present invention is directed to a water operation planning system for drafting a water operation plan in a water supply facility having a plurality of distribution reservoirs by using a computer having a processor and a memory. The computer has an interface for setting, by a user, a weight coefficient as a parameter for use in determining priority for recovering a water level. The processor calculates, under restriction on a water demand amount predicted based on the past water distribution amount, with respect to each of the distribution reservoirs, plan values of a flow amount and a water level which minimizes a predetermined object function including items calculated by using the weight coefficient and a value based on a relation between a predicted water level of a distribution reservoir and a target water level of the distribution reservoir, and outputs at least the plan value and the weight coefficient to the interface.SELECTED DRAWING: Figure 1
Owner:HITACHI LTD

Team management enabling training system

PendingCN120197891AInstrumentsManagement planningBusiness enterprise
The invention discloses a team management enabling training system, which relates to the technical field of enterprise management and specifically comprises a team management plan module, a team management equipment selection module, a team management task making module, a team management check requirement module and a primary team enabling training module. According to the invention, by effectively executing the team management daily activity plan, the working personnel of the grassroots team can realize early inspection and judgment of the production process and the equipment abnormity, timely correction is carried out through operation adjustment or simple maintenance, disastrous accidents caused by equipment defect evolution and expansion are prevented, and the working efficiency is improved. The complete process of team management tasks is formulated and implemented to assist enterprises in improving the basic management level of equipment and preventing major accidents, meanwhile, it can be effectively ensured that grassroots teams execute daily basic care activities of the equipment, equipment and production anomalies are controlled in the bud state, upgrading and expanding of tiny abnormal events are prevented, and the service life of the enterprises is prolonged. And the integrity management quality of enterprise equipment is improved.
Owner:BEIJING YIAI MANAGEMENT CONSULTING CO LTD

Aero-engine key component design life management method

The invention discloses a service life management method for aero-engine key component design, which gives basic contents contained in service life management after engine design is completed and the service life is determined, explains basic activities of service life management from a design source, and provides technical support for reliable operation and service life extension of an engine. According to the technical scheme, service life declaration comprises a service life declaration report, a service life management plan report and an engineering plan summary report, and information of all key parts of an engine should be combined into one service life declaration report, the related service life management plan report and the related engineering plan summary report; making a service life management plan after the service life declaration is approved by a bureau, wherein the service life management plan comprises the number of samples to be inspected and a service life zone thereof, a technical service life inspection scheme, a service life management plan range, a service life updating program, nondestructive testing specifications and process control, and application responsibility of the service life management plan; executing the service life management plan after the made service life management plan is approved by the bureau; and life examination or life extension.
Owner:AECC COMML AIRCRAFT ENGINE CO LTD

system

PendingJP2026103481AForecastingResourcesManagement planningVirtual conference
We provide the system. [Solution] A means including multiple artificial intelligences that collect data related to urban management and perform analyses on energy, transportation, and the environment based on said data, A means for conducting virtual meetings among multiple artificial intelligences, integrating urban management information, and generating an optimal management plan, A means for automatically executing urgent management instructions based on the generated management plan, A means of notifying the user of the results of the execution and enabling them to make further decisions, A system that includes this.
Owner:SOFTBANK GROUP CORP

Management planning system for production and manufacturing site

The invention discloses a management planning system for a production and manufacturing site, which comprises a planning information acquisition module, a work planning management module and an output module, and is characterized in that the planning information acquisition module is used for acquiring worker work division and real-time working conditions of the production and manufacturing site; the work planning management module is used for analyzing and evaluating the work spirit fullness condition of workers and planning and managing production equipment and scheduling work sub-items of the workers, the output module is used for outputting a management planning scheme to a production and manufacturing site and carrying out site scheduling, and the planning information acquisition module is in network connection with the work planning management module. The work planning management module is electrically connected with the output module, and the system has the advantages of being high in production efficiency and high in safety.
Owner:TAIAN ZHUOTAI MASCH CO LTD

Workload management method and system, computer equipment and storage medium

The invention relates to a workload management method and system, computer equipment and a storage medium. The method comprises the following steps: any management object only needs to configure a management plan corresponding to a target workload through a workload management system; according to the embodiment of the invention, the to-be-updated expected configuration rules of the target workload are read from the database according to the updating scheme corresponding to the triggering mode to form the target to-be-updated list, and the target workload is automatically updated by executing each expected configuration rule in the target to-be-updated list, so that the workload does not need to be manually adjusted; even if a plurality of different management objects have different management plans for the same workload, the related expected configuration rules are automatically read according to the update schemes corresponding to different trigger modes for unified update, so that repeated update of the workload in a change time window is avoided.
Owner:MICRO INSURANCE AGENCY LTD

Building electrical full life cycle management method based on digital twinning

The invention relates to the technical field of full life cycle management, in particular to a building electrical full life cycle management method based on digital twinning. The method comprises the following steps: analyzing a time interval to determine whether the determination of a life cycle management plan of the electrical equipment is qualified or not, and when the determination of the life cycle management plan of the electrical equipment is preliminarily judged to be unqualified, secondarily judging whether the determination of the life cycle management plan of the electrical equipment is qualified or not based on the time domain dispersion of the time interval; by periodically counting the time interval between the actual maintenance node and the expected maintenance node and carrying out time domain dispersion analysis, the rationality of the life cycle management plan can be scientifically evaluated, secondary judgment or reason analysis can be carried out on the unqualified plan, the maintenance strategy is continuously optimized, and the overall operation and maintenance cost is reduced.
Owner:MINXI VOCATIONAL & TECHN COLLEGE

Power plant work plan creation support system and power plant work plan creation support method

It can reduce the effort required to create work plans for power plants. [Solution] A power plant work plan creation support system 10 that supports the creation of work plans 27 for inspection work etc. at a power plant, comprising: a first processing unit 13 that uses past process plans 16A, work area plans 16B, system management plans 16C and man-hour accumulation plans 16D to confirm first conditions 21 regarding the current work style, quality non-conformity and accidents; a second processing unit 14 that performs similarity search and clustering processing on past process plans, work area plans, system management plans and man-hour accumulation plans using machine learning and creates process plans 23A, work area plans 23B, system management plans 23C and man-hour accumulation plans 23D that satisfy the first conditions from the processing results; and a third processing unit 15 that combines the process plans 26A, work area plans 26B, system management plans 26C and man-hour accumulation plans 26D that have been corrected after being created by the second processing unit to create a work plan 27.
Owner:KK TOSHIBA +1

A tourism industry management planning method for climate health care

This invention discloses a tourism industry management and planning method for climate-based health and wellness tourism, belonging to the field of tourism management technology. Specifically, it includes: collecting a set of climate data and a set of tourist health profiles for the target tourist area; calculating the daily climate comfort level within the planning period based on the climate data set; inputting the climate comfort level sequence and the tourist health profile set into a climate-based health and wellness matching model to generate a daily suitability score for each tourist health profile; planning a sequence of health and wellness activities and spatial movement paths for each tourist health profile based on the suitability score sequence; summarizing the planning data of all tourist health profiles to generate an overall tourist distribution prediction and infrastructure load forecast; adjusting the density of the health and wellness activity sequence and the guidance strategy for spatial movement paths based on the prediction results to form the final planning scheme. This invention provides a scientific and systematic planning and management method for the climate-based health and wellness tourism industry.
Owner:MINJIANG UNIVERSITY +1

Space region management planning method and system based on block chain, and storage medium

PendingCN119940798ADigital data protectionOffice automationManagement planningSmart contract
The invention belongs to the technical field of space development, and particularly relates to a space region management planning method and system based on a block chain, and a storage medium. Comprising the following steps: 1, carrying out digital registration on related space tasks, resources and participants, writing task requirements, resources and participant identity information into a block chain, and carrying out chaining; 2, compiling the smart contract according to the priority of each space task and the use rule and scheduling rule of resources; step 3, task scheduling and resource allocation are carried out through the rule of the smart contract; 4, acquiring environment change information in real time, and adjusting resource allocation and task execution according to environment change; and 5, after the task is executed, recording and storing task related data through the block chain. Space region management and task scheduling are realized based on the block chain, and the security and transparency of task execution can be improved.
Owner:ZHONGBEI UNIV

Steel bridge manufacturing and installation management system and method based on BIM technology

PendingCN120634331AGeometric CADData processing applicationsManagement planningProcess design
The invention provides a steel bridge manufacturing and installation management system and method based on a BIM technology, and relates to the technical field of steel bridge manufacturing and installation, and the system comprises a tool set unit which constructs a BIM model of a steel bridge and generates a process drawing and a work amount list; the process design unit is used for performing process analysis according to a process drawing and an engineering quantity list to obtain a management plan of the steel bridge in a manufacturing stage; the analogue simulation unit is used for carrying out processing and manufacturing analogue simulation according to the management plan; the installation management unit is used for generating multiple management plans of the steel bridge in the installation stage according to the management plans; and the delivery unit carries out delivery according to the management plans of the steel bridge in the manufacturing stage and the installation stage. According to the invention, refined management and control of progress, quality, safety and cost of design, manufacturing, installation and delivery of the steel bridge are realized through a digital means, the installation efficiency and quality are improved, and efficient cooperation and refined management of the whole process of manufacturing and installation of the steel bridge are realized.
Owner:CHINA RAILWAY JIUJIANG BRIDGE ENG +1

Platform management method and platform management system for packaging box

The invention relates to a platform management method and platform management system for packaging boxes, the method is used for the platform management system of a main manufacturer to realize informatization management, and the method comprises the following steps: establishing a standardized category database of the system; obtaining an original packaging box comprehensive table corresponding to the standardized category database; the actual management strategy of the main manufacturer is obtained after adjustment is conducted on the basis of the original packaging box comprehensive table; and obtaining a comprehensive service management plan based on the actual management strategy of the main manufacturer, and updating the original packaging box production schedule according to the comprehensive service management plan. In the existing packaging box production process, the situation of resource mismatching often occurs, that is, a production line is used for producing packaging box products with low additional value; therefore, the problem of mismatching of production resources of packaging box enterprises can be solved.
Owner:SHENZHEN MINGRUIJING PACKAGING PRODUCTS CO LTD

Fuel management system and method of nuclear power plant and electronic equipment

PendingCN121094297AData processing applicationsText processingManagement planningNuclear power
The invention discloses a fuel management system and method of a nuclear power plant and electronic equipment, and relates to the field of nuclear power, the fuel management system comprises a related component module and a fuel component module, the related component module comprises a first basic data module, a component configuration module and a result statistics module, and the first basic data module is used for maintaining basic data of related components; the related components comprise a control rod component; the component configuration module is used for configuring at least one management strategy of the control rod component according to the basic data of the related component so as to reduce single wear of the control rod component; the result statistics module is used for analyzing the basic data of the related components and the management strategy configured by the component configuration module, and formulating a management plan of the related components; the fuel assembly module is used for determining a management plan of the fuel assembly according to the operation data of the fuel assembly. According to the invention, automatic data management of related components and fuel components is realized, a related management plan can be automatically made, and the fuel management efficiency of the nuclear power plant is effectively improved.
Owner:LIAONING HONGYANHE NUCLEAR POWER

system

PendingJP2026101430AHealth-index calculationMental therapiesManagement planningTerminal equipment
We provide the system. [Solution] A terminal device for aggregating information obtained from individuals, Processing device means for analyzing the aggregated information and evaluating the state of the individual, A processing device that proposes a specific management plan for an individual based on the analysis results, A means of notifying individual devices of the proposed management plan via a terminal, A processing device that continuously monitors changes in the state of an individual and issues a warning when an abnormality is detected, A means of aggregating information to be used for health promotion activities in the local community, A system that includes this.
Owner:SOFTBANK GROUP CORP

Resource optimization method and device, equipment, storage medium and product

PendingCN122066107AFinanceSpecial data processing applicationsManagement planningData set
The invention belongs to the technical field of artificial intelligence, and discloses a resource optimization method and device, equipment, a storage medium and a product. According to the invention, data integration is carried out on the collected customer data and market data to obtain the integrated data set, and then the initial health management plan, the initial dynamic insurance policy and the initial resource usage amount corresponding to the customer are determined according to the integrated data set; and then constructing a target function based on the health management plan adjustment amount, the dynamic policy adjustment amount and the resource optimization adjustment amount corresponding to the client, and optimizing the initial health management plan, the initial dynamic policy and the initial resource usage amount based on the target function. According to the method, the interaction relationship can be maintained in the process of adjusting the dynamic insurance policy and the health management plan, so that the dynamic insurance policy and the health management plan do not deviate from each other or contradict each other, the optimization result of the resource usage amount is not easy to deviate from the basic health condition and the basic risk condition of the customer, and the resource usage amount of the customer can be effectively optimized.
Owner:CHINA MOBILE FINANCIAL TECHNOLOGY CO LTD +1

Data partition management planning method and system for AI smart city

The invention discloses a data partition management planning method and system for an AI smart city, and relates to the technical field of data planning management, and the method comprises the following steps: data classification: classifying initial data of the smart city according to different types and purposes, including traffic data, environmental data, energy data and social governance data; and data partitioning: associating the data based on the data type, respectively calculating the geographical partitioning association degree, the time partitioning association degree and the subject partitioning association degree of multiple sub-data in the same type of data, and performing partitioning management based on the association degree among the data during data partitioning management planning. Through machine learning and an artificial intelligence algorithm, deep analysis and simulation prediction can be performed on city data, scientific decision support is provided for city managers, and city planning and management are optimized.
Owner:LIANYUNGANG YUNQIAO INFORMATION TECH CO LTD

River natural-like assembled treatment planning method

ActiveCN121052677BWater resource protectionForecastingHydrometryManagement planning
The present application belongs to the technical field of river management, and specifically relates to a river quasi-natural assembly type management planning method. The present application obtains river hydrological characteristic parameters through remote sensing images, and combines multi-scale morphological clustering analysis to divide dominant morphological units, thereby realizing accurate identification of river morphological characteristics and division of management units, so as to improve the pertinence and adaptability of the management scheme. Through the matched management scheme in the management module library, assembly type management is implemented to improve the management efficiency and standardization level. Through real-time collection of the management recovery amount and closed-loop adjustment of the backtracking optimization mechanism, dynamic adaptation and accurate regulation of the management process are ensured, the ecological restoration effect of the river is effectively improved, and at the same time, when the management is invalid, an alarm prompt and an abnormal management unit marker are provided to facilitate quick identification and intervention of the management end, and the present application has strong practicability and operability.
Owner:CHINA CONSTR WATER ENVIRONMENTAL PROTECTION CO LTD

Three-dimensional semantic driven airport luggage intelligent retrieval method and system

The application discloses a three-dimensional semantic driven airport luggage intelligent retrieval method and system, relates to the technical field of management planning, and comprises the following steps: S10, acquiring an original point cloud of luggage to form a three-dimensional semantic feature F 3d raw ; S20, converting the three-dimensional semantic feature F 3d raw into a high-dimensional semantic vector F 3d , mapping the high-dimensional semantic vector F 3d to a public semantic space to generate a vector; S30, storing the vector into a database; S40, inputting a language describing the luggage to be converted into a vector; S50, calculating a cosine similarity of a text semantic vector and the three-dimensional semantic vector, arranging in descending order of the cosine similarity, and recalling TOP-K candidate luggage; and S60, generating a fine-grained matching score according to the candidate luggage, and reordering in combination of the cosine similarity and the fine-grained matching score.
Owner:CIVIL AVIATION CARES OF XIAMEN LTD