The invention relates to the technical field of drainage
pipe network comprehensive treatment
engineering construction, and discloses a drainage
pipe network comprehensive treatment
engineering construction plane arrangement method which comprises the steps of data collection through a GIS technology, intelligent
problem identification, new
system design,
simulation testing, accurate construction division, safety
management planning, construction implementation,
system function testing and the like. The GIS technology and the
data analysis technology are utilized, intelligent recognition and positioning of the drainage
system problems are achieved, the problems of pipeline blockage, aging,
corrosion and the like are solved in a targeted mode, and the reliability and stability of the system are improved. Measures such as
dynamic simulation testing, accurate construction area division and safety
management planning are adopted, the construction quality and safety are ensured, meanwhile, comprehensive system function testing is carried out, the
overall efficiency and stability of the system are verified, and a reliable basis is provided for government acceptance.