A Calculation Method for Line Loss of Small Hydroelectric Power Lines Considering the Maximum Load Duration
A technology with maximum load and duration, applied in the field of power transmission and distribution, it can solve problems such as high loss, and achieve the effect of accurate loss level and reliable data support
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0025] One of the commonly used methods to calculate line power loss is the maximum load loss time method, that is, the maximum load utilization hours and power factor , get the maximum load loss hours directly from Table 1 , then use the power loss at maximum load hours with maximum load loss Multiply to get the annual power consumption , and then divided by the annual input power of the line , the line loss rate can be obtained .
[0026] Table 1 Relationship between maximum load loss hours, maximum load utilization hours and power factor
[0027]
[0028] Note: The relationship between the maximum load loss hours, the maximum load utilization hours and the power factor is obtained by Grarunov based on the load conditions of the power grid in the former Soviet Union in the 1940s, using mathematical statistics. my country's electric power design instruction manual It has always been based on this.
[0029] The annual power consumption of the line is:
[003...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More - R&D
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com



