Greening method and structure for high and steep rock slope of surface mine
A technology for rocky slopes and mines, applied in the field of regreening design of rocky slopes after open-pit mining, can solve the problems of not using land and saving land, achieve safety and regreening effects, and prevent slope slippage , Strengthen the effect of regreening effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0038] The present invention is described in further detail with reference to the accompanying drawings and specific embodiments.
[0039] A greening structure of a high and steep rock slope in an open-pit mine, including multi-layer steps, forming a planting soil backfill area 110, a stripping layer backfill area 120, and a step backfill area 130 in the multi-layer steps, and the step backfill area 130 is located in the next planting soil backfill The top of the area 110, the bottom of the last planting soil backfilling area 110, the step backfilling area 130 is used to plant trees, the planting soil backfilling area 110 is used to form the vegetation protection surface, and the stripping layer backfilling area 120 is between the planting soil backfilling area 110 and the rock quality. between the slopes to form the transition from the rocky slope to the planting soil backfill area 110;
[0040] The long anchor rod 141 passes through the peeled layer backfill area 120 from th...
PUM

Abstract
Description
Claims
Application Information

- R&D
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com