Feeder automation physical simulation verification platform and test method
A feeder automation and physical simulation technology, applied in instruments, simulators, control/regulation systems, etc., can solve the problems of inability to simulate various operating conditions of 10kV distribution lines, single test function, slow switching of switches, etc. Effects of Feeder Automation Functional Testing Capability
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0053] Such as Figure 4 As shown, the test two-phase short-circuit fault is located at the subsection point of the circuit breaker, the D05 switch refuses to move, and the voltage-time feeder automation strategy correctly operates to isolate the fault.
[0054] In this embodiment, the fault simulation system is connected to the line unit at the back side of D05 and the front side of D06, and the protection measurement and control unit detects the fault current signal, and the state quantity output module controls the CB overcurrent tripping through the main controller , the terminal under test controls D04 and D06 to open on loss of voltage; after the main controller controls CB to reclose successfully, the terminal under test controls D04 to automatically close after X time of incoming calls. Accelerated trip after the fault information, the terminal under test controls D04 loss of voltage to open and lock forward, and D06 reverse locks; after CB recloses successfully, LS2 c...
Embodiment 2
[0056] Such as Figure 5 As shown, the test single-phase ground fault is located on the front side of the line tie switch, the operating conditions of each switch are normal, and the self-adaptive integrated feeder automation strategy works correctly to isolate the fault.
[0057] In this embodiment, the fault simulation system is connected to the line unit at the rear side of D06 and the front side of LS2, and the terminal under test on the D04 side is put into the fault line selection mode. After D04 is successfully reclosed once, D05 and D06 are automatically closed after X time; after D06 is closed, due to the reclosed fault within Y time, the terminal under test on the switch side of D06 detects a ground fault and then accelerates to trip and lock , LS2 reverse blocking, complete fault isolation and restore power supply, and complete self-adaptive comprehensive feeder automation function test at the same time.