Cabin deck floor drain positioning tool and installation process thereof
A technology for positioning tooling and installation technology, applied in the direction of ships, etc., can solve the problems of the difficulty of ensuring the level of the deck surface and the high installation height of the floor drain on the upper surface of the floor drain, and achieve the effect of the level of the installation plane and the accurate installation height.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0037] A cabin deck floor drain positioning tool, comprising a positioning ring body 1, the inner hole wall of the positioning ring body 1 is in clearance fit with the corresponding outer wall of the floor drain;
[0038] And the locking positioning parts 2, the locking positioning parts 2 are evenly distributed on the same side of the positioning ring body 1, the locking positioning parts 2 act synchronously, and are used to clamp the floor drain so that the virtual axis of the floor drain is aligned with the positioning ring body 1 The virtual axis coincides, or the floor drain is loosened;
[0039] Wherein, the virtual straight line where the moving direction of the locking positioning member 2 passes through the center of the positioning ring body 1, the positioning ring body 1 is provided with an opening 3 for coming out of the floor drain, and the opening 3 is located between adjacent locking positioning members 2 Position ring body 1.
[0040] The locking locator 2 inc...
Embodiment 2
[0047] A cabin deck floor drain positioning tool, comprising a positioning ring body 1, the inner hole wall of the positioning ring body 1 is in clearance fit with the corresponding outer wall of the floor drain;
[0048] And the locking positioning parts 2, the locking positioning parts 2 are evenly distributed on the same side of the positioning ring body 1, the locking positioning parts 2 act synchronously, and are used to clamp the floor drain so that the virtual axis of the floor drain is aligned with the positioning ring body 1 The virtual axis coincides, or the floor drain is loosened;
[0049] Wherein, the virtual straight line where the moving direction of the locking positioning member 2 passes through the center of the positioning ring body 1, the positioning ring body 1 is provided with an opening 3 for coming out of the floor drain, and the opening 3 is located between adjacent locking positioning members 2 Position ring body 1.
[0050] The positioning ring body 1...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


