Shield tunnel forward design method and system based on BIM and medium
A technology of shield tunneling and design method, which is applied in the direction of tunnel, tunnel lining, calculation, etc., and can solve the problems of lack, large volume, and reduced model accuracy, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0039] Such as figure 1 and figure 2 As shown, the forward design method of shield tunnel based on BIM in this embodiment includes assembling the N+1th ring pipe ring on the shield forward plane ① of the Nth ring pipe ring. When assembling the N+1th ring pipe ring, it includes Determine the fixed space posture and the space angle rotation posture of the N+1th ring pipe ring, and the fixed space posture of the N+1th ring pipe ring is the forward center point ② of the Nth ring shield as the center starting point, and the first The straight line ③ where the normal vector of the plane where the forward direction of the N ring shield is located is the central axis for positioning; the method for determining the angular rotation attitude of the N+1 ring pipe ring includes: determining the Nth Nth based on the number of positioning holes j of the longitudinal splicing of the pipe ring The number of rotatable positions ⑥ of the +1 ring pipe ring is k and satisfies k=j. Among the k t...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 