[0051] The present invention will be described in detail below with reference to the accompanying drawings and in combination with embodiments.
[0052] like Figure 1 to Figure 5 As shown, a construction method of stone pavement alkali return control diversion net, comprising the following steps:
[0053] S1. Maintenance treatment of structure 1 to make the surface of structure 1 smooth, clean and hydrated, including:
[0054] S11. After masonry or pouring and demolition, the surface of the structure body 1 is repaired, cleaned and leveled;
[0055] S12. Watering or immersion maintenance for 7 days;
[0056] S13. Clean the surface of the structure body 1 and then dry it.
[0057] S2. Brushing waterproof paint, brushing waterproof paint on the surface of structure 1 to form a structure waterproof layer 2 that completely covers the surface of the structure; wherein, the waterproof paint is a cement-based permeable crystalline waterproof paint, and the waterproof paint is pai...