Simple device for controlling distance between cross beams in pre-tensioning pre-stress construction and using method of simple device
A technology of prestressing and pretensioning, which is applied in the direction of manufacturing tools, ceramic molding machines, auxiliary molding equipment, etc., can solve the problems of uniform tensioning and inability to prestress tendons, and achieve uniform tensioning, avoid interference, and simple structure Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 5
[0039] Embodiment 5, a simple device for controlling the distance between pretensioned and prestressed construction beams. The difference between it and Embodiment 4 is that the fixed beam 2 is provided with a guide assembly 10 that cooperates with the traction rope 3, and the guide assembly 10 is arranged symmetrically. On the left and right sides of rangefinder ruler 9. The guide assembly 10 includes a guide wheel I10-1 and a guide wheel II10-2, the guide wheel I10-1 is arranged on one side of the pulley block II13, the guide wheel II10-2 is arranged on the side close to the distance measuring ruler 9, and the guide wheel I10- 1 and the guide wheel II 10-2 are connected with the fixed beam 2 through the connecting plate II 10-3. One end of the first fixed pulley 4-1 traction rope 3 that walks around the movable crossbeam 5 connects from the bottom after bypassing the guide wheel I 10-1, then bypasses the top of the guide wheel II 10-2, and finally connects with the distance ...
Embodiment 6
[0040] Embodiment 6 is a simple device for controlling the spacing of pretensioned prestressed construction beams. The difference between it and Embodiment 5 is that the lifting supports 8 are symmetrically arranged jacks, and the jacks are used to lift up the movable beams 5 . The connecting rib 6 includes a first connecting rib 6-1 and a second connecting rib 6-2, the first connecting rib 6-1 is arranged on the prefabricated beam 12, and the second connecting rib 6-2 is connected with the movable beam 5 through the connector II11 , and the connector II11 is arranged on the upper part of the movable beam 5, and the first connecting rib 6-1 is connected to the second connecting rib 6-2 through the connector I7. Connector Ⅰ7 and connector Ⅱ11 are finish-rolled rebar connectors or steel strand connectors. The first connecting bar 6-1 is a connecting bar 6 used repeatedly, and the second connecting bar 6-2 is a prestressed bar used when pouring concrete. The first connecting bar ...