Concrete retaining wall hard landscape ecological softening structure and construction method thereof
A concrete and retaining wall technology, applied in the field of ecological greening, can solve the problems of wall deformation or even overturning, affecting the stability of the wall, and large exposed areas
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
preparation example Construction
[0059] In the present invention, the method for preparing the glutinous rice-based ecological material preferably includes: pregelatinizing glutinous rice flour and water to obtain the glutinous rice-based ecological material.
[0060] In the present invention, the pre-gelatinization time is 60-90 minutes, and the pre-gelatinization temperature is 80-90°C. The present invention adopts the above temperature and time of pregelatinization to ensure sufficient gelatinization of glutinous rice and water to obtain glutinous rice pulp, avoiding insufficient or excessive gelatinization of glutinous rice resulting in damage to the structure of glutinous rice pulp. And in the process of pregelatinization, it is necessary to keep stirring and keep the water level constant, so as to avoid the agglomeration of glutinous rice flour and facilitate the full gelatinization of glutinous rice starch.
[0061] In the present invention, the mass ratio of the soil to the glutinous rice-based ecolog...
Embodiment 1
[0090] build as figure 1 The ecological softening structure shown, the method is as follows:
[0091] (1) Concrete is used to pour the retaining wall 1, which is set up for the prevention and control of certain geological disaster hidden dangers, and the rolling rocks or side slopes behind the retaining wall will avoid causing potential safety hazards on the road in front of the wall.
[0092]In the process of pouring the retaining wall 1, the anchor connector 4 is penetrated in the retaining wall 1, and when the material is cut through the anchor connector 4, the length of the anchor connector 4 is determined by the position of the anchor connector 4, and the anchor connector 4 is required. Go through the reserved holes of the original formwork tie bars of the retaining wall 1, and form a U-shaped anchor head behind the wall.
[0093] (2) According to the mass ratio of water and glutinous rice flour of 1:0.5, add water three times, melt at 90°C to obtain glutinous rice glue,...
PUM
| Property | Measurement | Unit |
|---|---|---|
| Thickness | aaaaa | aaaaa |
| Thickness | aaaaa | aaaaa |
| Particle size | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More 


