Method and structure for installing three-phase live wire
A technology of installation structure and live wire, applied in measurement devices, instruments, measurement time integration and other directions, can solve the problems of low safety, difficult construction, insufficient power monitoring accuracy, etc., to improve safety, improve safety and reliability. performance, improving accuracy
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0030] A three-phase falling fire line installation method and structure of the present embodiment, such as Figure 1 and Figure 2 Shown, including the electrical box 1, the main switch 2, the meter body 3, the backplane 4, the motherboard placement area 5, the chip placement area 6 and the interface placement area 7, the main switch 2 and the meter body 3 are installed in the electrical box 1, the meter body 3 is installed on the base plate 4, the motherboard placement area 5 is set on the top of the meter body 3, the motherboard placement area 5 is installed with the meter motherboard 9, the motherboard placement area 5 is also installed with lcd display 51, the on key and reset key 52 and the warning light 53, the meter motherboard 9 is installed inside the motherboard placement area 5, LCD display 51, on key and reset key 52 and warning light 53 are installed outside the motherboard placement area 5, warning light 53 is installed on the upper end of the LCD display 51, the on k...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


